Laserfiche WebLink
-4- <br />14 <br />12. Primary future Post-minin land use check one : <br />Cropland(CR) D Pasturcland(PL) <br />Rangeland(RL) E Forestry(FR) <br />Residential(RS) FIRecreation(RC) <br />Developed Water Resources(WR) <br />FI General Agriculture(GA) <br /> Wildlife Habitat(WL) <br /> Industrial/Conunercial(IC) <br />F] Solid Waste Disposal(WD) <br />13. Primarv present land use (check one <br />? Cropland(CR) u Pasturciand(PL) <br />Rangeland(RL) ? Forestry(FR) <br />Residential(RS) _L1 Recreation(RC) <br />Developed Water Resources(WR) <br />? General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Method of Mining: Briefly explain mining method (e.g. truck/shovel): _ <br />Truck and Loader hauling raw material to the crusher. <br />15. On Site Processing: Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />crushing/screening and washing of raw material to make sellable material. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />Diesel Fuel <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The existing permit is a sandstone quarry and is going to expanded to 153.04 for the purpose <br />of mining sand and gravel for road construction material. There will be portable plants brought to <br />the site for processing of the raw material. There will be no blasting for the new operation. <br />