Laserfiche WebLink
• following sections. A water intake gallery located adjacent to the Purgatoire provides <br />water for the operation. Water is pumped either directly to the plant, to water tanks <br />located on higher ground south of the preparation plant, or to pond #1 for storage. <br />Water is piped from the storage tanks to the preparation plant and buildings at the site. <br />The slurry disposal system will deposit coal waste slurry to the abandoned <br />underground workings, and a well located north of the prep plant will recover water <br />from the slurry for reuse in the prep plant. <br />In the process of reclamation at the West Portal, the fan at the West Portal air shaft <br />was removed. This facility will be reinstalled for use as a bleeder fan ventilating the <br />West Mains area. As the projected life of this facility is unknown, it is planned to <br />power this installation with a diesel/electric generator or portable substation. The fan <br />site has not been reclaimed and will not result in an increase in mine disturbance area. <br />(3) Mine Facilities <br />(a).(b).Structures <br />The existing structures are shown on Map 11 East Portal Sheets 1 through 3 and <br />Map 12 Surface Facilities and Roads West Portal. Major facilities are listed on <br />Table 19 Surface Facilities List. Exhibit 28 Bond Calculations contains a detailed <br />description of all facilities and respective construction types. In general, structures <br />are built of structural steel, sheet metal, brick and mortar with concrete foundations. <br />is As shown on Map 15, the majority of these facilities and structures are built on <br />natural ground with coal stockpiles, refuse disposal and materials storage located on <br />pre -law fill areas. Other than the RDA and the sediment control system (ponds and <br />ditches), all land disturbances at the site were pre -law. <br />All West Portal buildi listed on Table 19 Surface Facilities List, have been <br />or <br />buried at approved locations on -site. As shown on Map 16, most of the facilities are <br />located on native soils as opposed to refuse fill areas. As ine recnvery rov ar___ esses, <br />e West_Pnrral �;r shaft will be reopened A small fan powered by a diesel/electric <br />generator or portable substation will be set over the shaft to provide ventilation for the <br />West Mains. An access road will be maintained from the Mine entrance road to th <br />fan and air shaft--A sma graveled narking area will be maintained adjacent to the <br />The startup of production from the mine requires upgrading or new construction of <br />support facilities in the East Portal area. The location of the facilities are included on <br />Map 11 New Elk Mine Plan East Portal Sheets 1 through 3: Sheet — Roads, Slope <br />Track and Cuts; Sheet 2 — Utilities and Ponds; and Sheet 3 — Facilities. A <br />geotechnical analysis was completed for the proposed foundations. The report is <br />included as Exhibit 39 Geotechnical Study — New Elk Mine Site Facilities. <br />The rope slope will funct as ventilation intake for the construction of entries to the <br />East Portal Shaft. The belt slope will be temporarily equippe wi two metal ex aust <br />ducts, one 36 inch diameter and one 30 inch diameter. Temporary exhaust fans will <br />TR -54 Page 2.05 -5 Revised 11/03/10 <br />