My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-08_PERMIT FILE - C1981012A (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2011-04-08_PERMIT FILE - C1981012A (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:28 PM
Creation date
4/12/2011 12:45:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
4/8/2011
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Table 19. Surface Facilities List <br />Map3C. New Hk Nine Slope Bottom Area — Apache Seam <br />Post -law facilities constructed or pennitted after August 3, 1977. <br />Apache Canyon air shaft #1 <br />Apache Canyon air shaft #2 <br />Map 13. Sediment and Surface Water Control Plan Fast Portal <br />Post -law facilities constructed or pennitted after August 3, 1977. <br />Ditches and culverts <br />Ponds with embankments and outlet works <br />Map 14. Sediment and Surface Water Control Plan West Portal <br />Post -law facilities constructed or pennitted after August 3, 1977. <br />Ditches and culverts <br />Ponds with embankments and outlet works <br />Map 11. New Elk Nine Site Plan Fast Portal <br />Sheet 1— Roads, Slope Track, Cott Areas <br />Facilities constructed prior August 3, 1977. <br />Roads <br />Post -law facilities constructed or pennitted after August 3, 1977. <br />Slope track <br />Sheet 2— Utilities <br />Facilities constructed prior August 3, 1977. <br />Water pumphouse tanks <br />Post -law facilities constructed orpennitted after August 3, 1977. <br />25,000 gallon water tank <br />400,000 gallon water tank <br />65,000 gallon raw water tank <br />Central pumping station (pumps to water tanks) <br />Fast Portal substation <br />Plant substation <br />p Powerlines to dewatering pumps (3) Powerhne to West Portal <br />Powerfine to loadout substation Bulk propane tank <br />Powerline to plant substation Intake air heaters (2) <br />Powerline to RDA substation <br />Refuse Substation <br />Sewage package treatment plant building <br />Water line from dewater pu nips to Pond #1 <br />Waterpipe vaults (7) <br />Removed frorn site <br />Loadout substation <br />Sheet 3— Facilities <br />Facilities constructed prior August 3, 1977. <br />Breaker building with rock box <br />Clean coal reclaim conveyor belt <br />Clean coal reclaim tunnel <br />Clean coal stockpile <br />Coal storage silos (2) <br />Compressor building w/ pressure vessel <br />Fast Portal air shaft (with fan) <br />Mine rescue practice field <br />Non -coal storage area (Equipment /Supply Storage) <br />Oil House <br />Raw coal stockpile Areas #1 and 2 <br />RiverCrossing foot bridge #1 <br />Rock dust storage <br />Scale(wash down facility) <br />Shop building (industrial) <br />• <br />TR -55 Page 2.05 -6 Revised 1/25/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.