Laserfiche WebLink
• <br />• <br />• <br />Power System Upgrade <br />The power system corridor upgrade is shown on Map I I Sheet 2 East Portal Utilities and Ponds. <br />Site Plan Area: Power Distribution (substation already bonded) <br />Slope Track <br />Item Belt Drive Ramp Area <br />Length (ft) 50 75 <br />Width (ft) 17 6 <br />Depth/height (ft) 2 2 <br />Quantity <br />Units <br />Unit cost <br />Total direct cost <br />Job supervision hours <br />63 33 <br />CY CY <br />$92 $92 <br />$5,793 $3,067 <br />8 8 <br />Job supervision cost <br />$333 <br />$333 <br />Profit, insurance, and bond <br />$757 <br />$401 <br />Contract <br />$6,883 <br />$3,801 <br />Engineering <br />$293 <br />$162 <br />Reclamation management <br />$344 <br />$190 <br />Estimated bond <br />$7,520 <br />$4,153 <br />TR 54 <br />Exhibit 28 —Page 150 <br />Revised 11 -03 -2010 <br />