My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
4/12/2011 12:35:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 71 & 72
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM0001793 <br />• <br />The lump sum and unit prices include, but are not limited to: <br />All labor costs, including supervision and administrative support; payroll <br />insurance, taxes and benefits; materials; consumables; expendables; small <br />tools; equipment; fuel; utilities and water; cost, progress, administrative and <br />accounting reports required by Contractor and/or CMC; insurance; <br />applicable taxes; profit; and all other services, overhead and expenses <br />necessary for the complete and satisfactory performance of the Work, except <br />such items as CMC in this Agreement specifically agrees to supply or <br />fiiunish to or for the use of Contractor. <br />2. All equipment costs, including operating labor, all gasoline, oil, grease and <br />other fuel, supplies, repair parts, repair labor, taxes, license fees, rentals, <br />supervision, insurance, overhead and profit and all other costs incidental to <br />the use of equipment, except such items as CMC in this Agreement <br />specifically agrees to supply or fizrnish to or for the use of Contractor. <br />3. All supplies necessary for the performance of the Work. <br />• <br />4. All lodging, subsistence and allowances required for Contractor's employees <br />engaged in the Work. <br />5. Mobilization and demobilization costs for all of Contractor's employees, <br />equipment and supplies. Also, transportation to and from, and in and around <br />the Site for Contractor's employees, equipment and supplies. <br />6. All temporary facilities and services required by Contractor for the <br />performance of the Work. <br />• <br />Measurement to determine interim payment for all Contractor non-lump sum items shall be <br />based on surveys performed by CMC. All initial and final surveys shall be performed by a <br />third party Colorado registered Licensed Professional Surveyor (LPS) contracted to CMC. <br />All interim surveys performed to determine progress payments shall be performed by CMC <br />under the direction of a Colorado LPS. Methods for deternzination of measurement and <br />payments based on surveys shall be as detailed in the measurement and payment section of <br />the Specifications. Any surveys performed by the Contractor to verify CMC developed <br />payment quantities shall be performed by a third party Colorado LPS and paid for by the <br />Contractor. <br />s:N6104\no_I.dsm\dnnLq u\prAnL 122 Oetaba 30, 1996 - Revised 1/22x97
The URL can be used to link to this page
Your browser does not support the video tag.