My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
4/12/2011 12:35:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 71 & 72
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM0001787 <br />• Mr. B. Romig <br />January 22, 1997 <br />Construction soil quantities presented in Table 4 were incorrect. A corrected Table 4 is included <br />with this letter. The construction soil quantities are largely dependent on foundation excavation <br />quantity and the percentage of the excavated material that can be reused in the Dam construction as <br />discussed in Section 4.1.2. If the excavation quantity increases beyond the Dam footprint, or if the <br />percentage of unusable material decreases, than additional construction soils may be needed from <br />the established borrow areas or new borrow areas. Options for additional borrow areas are: <br />increasing the depth and extent of the Tenmile Tunnel Portal Borrow Area; developing the <br />Mosquito Fault area if the material has acceptable chemical properties; developing the area west of <br />Robinson Lake in the vicinity of T?-D8;.or establishing a new borrow outside of the immediate <br />area of construction. <br />The Report assumed that sufficient quantity of riprap could be ripped from fractured bedrock at the <br />bottom of the island borrow areas or other outcrops locations. However, the riprap borrow areas <br />were not fully developed in the Report and blasting may be required to produce dam face riprap. <br />Other Issues Not Identified In The Design Report: <br />The following issues not addressed in the Report and are listed here for your consideration. The six <br />percent of bentonite amendment needed for Zone 1 presented in Section 4.4 was estimated based on <br />established references which correlate material grading and reagent additions to permeability. This <br />percent addition was confirmed from the evaluations performed by WyoBen, Inc. of Billings, <br />Montana. <br />Foundation design assumed that all material below the Dam is unsuitable for the Dam foundation in <br />its natural state and would be excavated and replaced with compacted suitable soils. As such, <br />consolidation calculations were not required. If in-place material is determined to be suitable and <br />not to requiring excavation, than consolidation of the foundation needs to be evaluated. <br />The Dam will have some operation and maintenance (O&M) costs. The manually-operated valves <br />will require some labor costs to operate, though the extent of 0&M costs are dependent on CMC's <br />future operational plans. Typical O&M issues include monitoring the Dam for foundation <br />subsidence, face sloughing and crest erosion. Siltation and the harsh environment created by the <br />low pH seepwater and extreme weather conditions will require regular maintenance for: the <br />conveyance pipeline valves, headwall concrete, pipe and discharge apron riprap; the spillway <br />concrete and riprap; the Chalk Mountain discharge pipeline outlet; pipe and discharge apron riprap; <br />the dam crest surfacing; and, the dam face riprap. <br />CMC has indicated that they may consider a smaller scale collection/sump system to convey <br />seepwater to the No. 1 Dam Pump Station as a more cost-effective alterative to Dam construction. <br />Any alternate design should consider the Robinson Lake high water level of approximately 10,892 <br />ft MSL. This elevation was the critical design parameter for the Dam crest elevation. Any structure <br />with a lower crest elevation would not prevent the commingling of Robinson Lake water with <br />seepwater if Robinson Lake was allowed to reach it's high water elevation. <br />U:ISPELLMAIACLIMAX.MOLVM IMAX\DFSSUMLT.D I 11/22/97 <br />- - - - -- V Environmental
The URL can be used to link to this page
Your browser does not support the video tag.