My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (62)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (62)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
4/12/2011 12:34:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 68 & 69
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM0001672 <br />0 SAMPLING AND ANALYSIS PLAN <br />EAGLE PARK RESERVOIR <br />CLIMAX MOLYBDENUM COMPANY <br />1.0 INTRODUCTION <br />This post reclamation Sampling and Analysis Plan (SAP) contains details of field activities to be <br />performed in 1996 and 1997, and subsequent analyses that will be used to confirm reclamation <br />project completion and water quality protection in the Eagle Park Reservoir. The purpose of the <br />SAP is to facilitate collection of representative samples and compilation of the data to <br />demonstrate reservoir water quality while providing a mechanism for planning and approving <br />field activities. <br />The key elements of this SAP include: <br />• Sampling of bottom material from Eagle Park Reservoir after excavation of the tailings is <br />complete to demonstrate effectiveness of tailings removal; <br />• Testing to show that the residual bottom materials in the reservoir are innocuous; <br />• Sampling of reservoir water during reservoir filling and operation to demonstrate attainment <br />of in-stream discharge standards as outlined in the "Colorado Department of Health Water <br />Quality Control Commission, Classifications and Numeric Standards for Upper Colorado <br />River Basin and North Platte River (Planning Region 12)", (Colorado Department of Health <br />Water Quality Control Commission, 1994); <br />• Sampling of seepage in the sump below Eagle Park Reservoir dam to establish current water <br />quality as a baseline and to confirm water quality objectives have been met; and <br />• Sampling recharge to the Eagle Park Reservoir from the Chalk Mountain Interceptor and the <br />North Interceptor canals. <br />This report consists of two separate SAPS to conduct investigations of 1) the reservoir bottom <br />materials, and 2) surface waters associated with the Eagle Park Reservoir. Each of the plans will <br />summarize the task objectives, number of samples and location, sample designations, sampling <br />equipment and procedures, analyses, and Quality Assurance/Quality Control (QA/QC) <br />procedures. <br />s <br />PRIVILEGED AND CONFIDENTIAL <br />C.VWXCZ116102-0OIW117610200116/W%l ?? ??? Environmental
The URL can be used to link to this page
Your browser does not support the video tag.