Laserfiche WebLink
CMC001665 <br />• <br />Eagle Park Reservoir <br />Sampling Summary Information <br />Development of the Sampling Analysis Plan (SAP) <br />Objective: To establish a sampling plan with appropriate protocol, Quality Assurance, <br />and Quality Control to demonstrate source (tailing) removal and water quality within <br />Eagle Park Reservoir. <br />DaW: June 1996 <br />Specifies: <br />• High level Quality Assurance and Quality Control (QA/QC). <br />• 3rd-Party sampling. <br />• 3rd Party Analysis at using a Contract laboratory Procedure (CLP) Certified <br />Lab. These laboratories are certified by the USEPA under an analytical <br />program developed to fill the need to provide legally defensible analytical <br />results. 40 <br />0