My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (62)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (62)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
4/12/2011 12:34:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 68 & 69
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CMC001665 <br />• <br />Eagle Park Reservoir <br />Sampling Summary Information <br />Development of the Sampling Analysis Plan (SAP) <br />Objective: To establish a sampling plan with appropriate protocol, Quality Assurance, <br />and Quality Control to demonstrate source (tailing) removal and water quality within <br />Eagle Park Reservoir. <br />DaW: June 1996 <br />Specifies: <br />• High level Quality Assurance and Quality Control (QA/QC). <br />• 3rd-Party sampling. <br />• 3rd Party Analysis at using a Contract laboratory Procedure (CLP) Certified <br />Lab. These laboratories are certified by the USEPA under an analytical <br />program developed to fill the need to provide legally defensible analytical <br />results. 40 <br />0
The URL can be used to link to this page
Your browser does not support the video tag.