CM0001663 <br />3. 4-Dam Seeo Retum Modification <br />This item was discussed above under Dam Modifications. This project was <br />approved as a modification to an existing Environmental Protection Facility for <br />routing of 4-Dam seep waters into Robinson Reservoir. thus, eliminating the current <br />routing into Eagle Park Reservoir. <br />4. Stormwater management <br />Stormwater management at Climax exists as an active program under permit from <br />the Colorado Department of Public Health & Environment. <br />a Water Conveyance <br />Water diversion structures were constructed in locations on the Upper North <br />Intercept and Chalk Mountain Intercept for flow control of intercepted water into the <br />reservoir. Lower North Interceptor control will be maintained via an existing culvert <br />at the ponds on the east end of the intercept. Future removal of the interceptors is <br />likely. <br />a Reclamation <br />Reconfiguration occurred within the basin and around the perimeter of the entire <br />pond during excavation of the tailing material. Some additional revegetation and <br />road obliteration work may be required around the project perimeter and along the <br />project haul roads. Specifics of the reclamation activities are provided in the 1996 <br />Annual Reclamation Report submitted to the Division of Minerals and Geology on <br />March 4, 1997. <br />Topsoil capture following tailing removal proved to be a significant benefit of this <br />project. A total of 56,400 cubic yards of topsoil were removed and stockpiled or <br />spread in late October of 1996. <br />a Water Quality <br />This report addresses the preliminary sampling of reservoir materials in preparation <br />for filling during the 1997 spring runoff. <br />