My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (62)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (62)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
4/12/2011 12:34:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 68 & 69
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CM0001654 <br />• <br />STATE OF COLORADO <br />)FRa of THE STATE e4GME't <br />)WW= of Water Rescumes <br />)epartmerrt of Naaual Resources <br />313 Shma a S&M Rase 818 <br />'hone (303) *64S81 <br />'AX (303) 866-3589 <br />W. Steven M Maly <br />W.W. Wheeler and Associates, Inc. <br />3700 South Inca Street <br />Englewood, CO 80110 <br />January 8, 1997 <br /> <br />a" <br />commm <br />WM S loddwd <br />6acow Dk"= <br />Mw Q smpan <br />Stir Esker <br />When replying, please refer to: <br />CLIlVIAX MOLY NO. 4 DAM <br />(AKA EAGLE PARK DAM) <br />Construction File Number: C-1106C <br />Water Division 5, DAM LW: 370103 <br />SUBJECT: Amendment to Conditional winter Shut Down of the Construction Project <br />Dear W. Maly: <br />This letter is in response to your recent telephone conversations with Marls Haynes of our office <br />concerning our letter dated December 9, 1996, which pertains to the contingencies of the approval of <br />the winter shut down plan for the constiuaron of the seepwater pipeline installation project at the <br />Climax Moly No. 4 Dam. Itris oWr understanding that the owner of the dam wishes to initiate the <br />-process of filling the reservoir this coming spring prior to bacldtiling the relatively small breach in the <br />dam embankment at the left abutment. This is not allowed in accordance with the provisions of the <br />fourth contingency as presented in our aforementioned letter. It is also our understanding that the dam <br />owner is willing to leave the slide gate of the recently installed outlet works at Elevation 10,684.5 in the <br />fiilly open position in order to allow them to initiate the filling of the lower portion of the reservoir this <br />spring and to assure the safety of the dam until the breach in the dam has been properly backfilled. <br />Based on the above information and a review of the files, the requirements of the fourth <br />contingency of our letter dated December 9, 1996 is hereby rescinded and the owner will be allowed to <br />initiate the filling of the lower portion of the reservoir. This amendment to the winter shut down plan is <br />made provided that the slide gate of the new outlet works is placed in the fully open position and the <br />normal reservoir water surface level is maintained at or below Elevation 10,684.5 until the breach in the <br />dam embankment is property backfilled. This amendment to allow storage of water is also contingent <br />on the completion of the requirements of our approval of the construction of the new outlet works as <br />presented in our letter dated October 22, 1996. The remaining requirements include the submittal and
The URL can be used to link to this page
Your browser does not support the video tag.