Laserfiche WebLink
G <br />CM0001650 <br />TABLE 4 <br />COST AND TIME ESTIMATES <br />RECLAMATION MEASURES <br /> <br /> <br />it <br /> <br />i <br />11 <br />U", <br />^l. <br /> <br />L <br />r <br />RECLAMATION COMPONENT COST ESTIMATE ESTIMATED <br /> RANGE TIME TO <br /> COMPLETE <br /> (DAYS) <br />Eagle Park Reservoir - Reclamation $29,300 to $34,800 2.5 <br />Measure #1: Rip-Rap Placement <br />Eagle Park Reservoir - Reclamation $4,740,000 to $5,620,000 166 <br />Measure #2: Dam Raising <br />Robinson Lake Drain $16,800 to $38,000 1.2 <br />Robinson Lake Reclamation - Active $3,650,000 to $4,300,000 73 <br />Reclamation <br />Robinson Lake Reclamation- $20,900 to $24,800 3 <br />Passive Reclamation: Rip - Rap <br />Placement <br />No. 1 Tailing Dam Seep Water - $780,000 to $925,000 38 <br />Physical Containment <br />No. 1 Tailing Dam Seep Water - 497,900 to 590,700 26.4 <br />Passive Treatment <br />Surface Water Diversion $16,400 to $19,400 3 <br />Specific assumptions and calculations presented in Appendix B <br />Costs do not include mobilization/demobilization costs <br />_ ° ° ' =_ Environmental.