Laserfiche WebLink
CMC001606 <br />Mr. Bryce Romig Page 3 July 25, 1996 <br />placement of the perforated drainage collection. The collection pipe was wrapped with a <br />• <br />geotextile cloth (as per specification) and was backfilled with a sand/gravel media. <br />Photographs 13 and 14 show the backfilling and final grading of the site. Photograph 15 <br />presents a view of the completed grade prior to completion of the collection sumps and <br />conveyance lines. <br />I trust this submittal meets with your approval. If you have any questions or comments, <br />please feel free to contact me at 800/605 -9852. <br />Respectfully, <br />Titan Environmental Corporation <br />John F. Lupo, Ph.D., P.E. <br />Project Manager <br />JFL/bsf <br />cc: Jay - Climax e w <br />y upp ax Min , /o drawings <br />John Clapper - Climax Mine, w/o drawings <br />Attachments <br />`:V%°'EC `S'S' I—OW Environmental <br />