Laserfiche WebLink
Robinson Lake seepwater collection and return system were completed in general <br />conformance with the drawings and specifications. The project design was <br />reviewed and accepted by the Colorado Division of Minerals and Geology as part of <br />the Environmental Protection Plan TR -07, Climax Mine Reclamation Permit Number <br />M -77 -493. The construction of the modifications were substantially completed in <br />the fall of 2000 by Schmueser and Associates. The undersigned conducted <br />periodic site inspections during the construction of the project and Climax personnel . <br />performed daily inspections. <br />