My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (54)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (54)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
4/12/2011 12:34:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Ex. 67
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
m
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CMC001593 <br />CLIMAX MOLYBDENUM COMPANY <br />• A subsidiary of Photos Dodge Mmmg CompaM <br />• <br />August 25, 2000 <br />Allen Sorenson <br />Division of Mineral and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Robinson Lake Seep Collection <br />Dear Mr. Sorenson: <br />Climax_ Mine <br />Hwy. 91 <br />Climax. Colorado 80429 <br />(719) 486.2150 <br />Fax (719) 486 -2251 <br />Attached for your information is a plan for improvements to the Robinson Lake seepage collection <br />system. The attached designs are the result of discussions held with you in inspections held on <br />May 19, 1997 and September 4, 1997 in which we discussed acceptable approaches to improved <br />collection of seep waters at the toe of Robinson Reservoir. The plan calls for adding a factor of <br />safety to existing pollution prevention through expansion of the holding pond for spring snowmelt <br />surges, extending the height of the cuttoff wall to allow for improved visual checks of the water <br />level, replacement of the groundwater pumps with more maintainable submersible pumps, and <br />replacement a culvert between the upper surface ponds. Redundant pipelines will also be <br />relocated to prevent freezing during winter operations. <br />Upon completion of construction, Climax will provide the Division with a certification for <br />construction to the design specifications. Pump specifications will be provided with the water <br />management equipment list scheduled to be incorporated into the Hydrologic Protection portion <br />of the pending Climax Mine Financial Warranty. <br />These improvements do not modify the original function or construction of the cuttoff wall. Climax <br />plans to install these improvements through the month of September. <br />If you have any questions, please contact me at (719) 486 -2150, ext. 723. <br />Since ly, <br />Sr Romig <br />Climax Molybdenum Company <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.