My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (40)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:18 PM
Creation date
4/12/2011 12:32:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 39 to 43
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o` <br />CM0001260 <br />4 2 b b 0 1991 AUG I LI A 10: 2IF <br />_ DORIS L. BRILL SUMMIT COUNTY RECORDER <br />EASEMENT DEED <br />This Deed, dated this L_?1-t,.riay of August, 1992, is <br />from the Clinton Ditch & Reservoir Company, a Colorado <br />nonprofit ditch and reservoir company (the NCompanyN), to <br />climax molybdenum Company, a Delaware corporation (NClimaxN), <br />101 Merritt 7 Corporate Park, P.O. Box 5113, Norwalk, <br />Connecticut 06856-5113, Attention:_ President. <br />For good and valuable consideration,'the receipt-and. <br />sufficiency.of which are hereby acknowledged,..the Company <br />hereby grants, bargains, sells and conveys to Climax the <br />following: <br />is <br />1. a non-exclusive easement in and across the real <br />property described on Attachment 1 hereto for operation and <br />maintenance of a pipeline, currently constructed across the <br />dam appurtenant to the Clinton Gulch Reservoir, for transport <br />of water through the Supply Canal No. 1 and for the benefit of <br />1 the Supply Canal No. 1. The easement.shall run until such <br />w time as_the Supply Canal No. 1 shall cease operations on a <br />^I permanent basis, at which time this easement shall terminate <br />automatically and without any action on the part of the <br />` Company or Climax. Upon such termination Climax shall, at its <br />cost, remove the.pipeline and repair any damage caused by such <br />removal; and. <br />2. a non-exclusive easement in., on, over and across <br />the real property described on Attachment 2 hereto for <br />construction, operation and maintenance of (a) a pipeline, not <br />to exceed 42 inches in diameter, to transport tailings and <br />water from such sources as Climax shall select, and (b) such <br />utilities to which the Company consents, which consent shall <br />not be unreasonably withheld. The easement shall run until <br />such time as:the pipeline ceases operations on a permanent <br />basis, at which time Climax shall remove the pipeline within <br />120 days thereafter and this easement shall terminate <br />automatically and without any action on the part of the <br />Company or Climax. Upon such termination Climax shall, at its <br />cost, remove the pipeline and repair any damage caused by such <br />removal. <br />3. A non-exclusive perpetual easement across the <br />real property described on Attachment'2 hereto for <br />construction,.operation.and maintenance of gas and telephone <br />lines; provided, however, that all lines replaced or installed <br />after the'date hereof shall be placed underground. The <br />easement shall run until such time as the utility lines cease <br />Exhibit 42
The URL can be used to link to this page
Your browser does not support the video tag.