Laserfiche WebLink
CM0001179 <br />• <br />Attachment 1 <br />(Attached to Exhibit D of the Reservoir Purchase Agreement <br />between the Clinton Ditch & Reservoir Company <br />and Climax. Molybdenum Company) <br />CLINTON GULCH RESERVOIR <br />FACILITIES LIST <br />All personal property, as built, used in connection <br />with, located on or appurtenant to the Clinton Gulch <br />Reservoir, including but not limited to the following <br />personalty, as described in construction documents therefor <br />(including.all deviations thereto): <br />1. outlet Works; including inlet canal and structures, trash <br />racks, 40 1/161, diameter orifice plate, 481, hydraulic actuated <br />butterfly valve with Bettis operator, 48- steel piping encased <br />in concrete with four one-inch diameter hydraulic control <br />lines, and all other appurtenant and auxiliary equipment <br />listed herein and as shown on Woodward-Clevenger .& Associates, <br />Inc. Drawing Numbers 11f6-6, -8 and -9,•. <br />2. Spillway Conduit, including inlet canal and structure, <br />trash racks, 721, by 601, by 481, reducing reinforced concrete <br />pipe, concrete cradles, 180 air vent with concrete encasement, <br />cover and four one-inch hydraulic control line vents, and all <br />as shown on Woodward-Clevenger Drawing Numbers 11f6-6, -8, -9 <br />and -10, and Black and Veatch. Drawing Numbers 11f6-32, -35 and <br />-36. <br />3. Outlet Structure, including valve structure and energy <br />dissipator, all constructed of concrete, and 480, 3611, 301,, <br />181, and 121 steel piping and control valves and operators, <br />access ladders and platforms, 31, drain line, and all other <br />appurtenant and auxiliary equipment listed herein and shown on <br />Woodward-Clevenger Drawing Numbers llf6-6, -8, -11, and-12, <br />and Black and Veatch Drawing Numbers 11f6-30, - 31, -32 and <br />-33, that are necessary for normal access to the valve chamber <br />and outlet structure. .The 301, supply canal and sluice gate <br />shall remain the property of Climax. <br />4. Piezometers and Monitoring Points. including nine open <br />wells and movement points as shown on Woodward-Clevenger <br />Drawing Number 11f6-15A. <br />• <br />D-2