My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (47)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (47)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:18 PM
Creation date
4/12/2011 12:32:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 34 to 38
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM0001145 <br /> <br />place an administrative call against, or otherwise prevent <br />water from being stored.in the Reservoir. If Climax elects to <br />transfer such rights to a new location;l..Climax shall not seek <br />or accept any terms.or conditions to such transfer which may, <br />in the company's reasonable determination, adversely affect the <br />ability to fill the.Reservoir each year, adversely impact the <br />yield of the Reservoir or adversely affect the operation or. use <br />of the Reservoir by the Company. Climax shall provide.to the <br />Company a copy of any terms upon which such a.transfer may be <br />conditioned, and the Company shall have 30 days thereafter to <br />object to the transfer on such terms. Climax shall not proceed <br />with such transfer until it has satisfied all of the Company's <br />objections. <br />conduct opera- <br />upon any land <br />may adversely <br />determined in <br />Reservoir. <br />(b) Climax.further <br />Lions upon, or allow <br />owned or controlled <br />impact the quantity <br />Section 5(b) above, <br />agrees that it shall not <br />operations to-be conducted <br />by Climax in such a manner as <br />or impact.the quality as <br />of water flowing into the. <br />8.- Grant of Easements. (a) Climax hereby agrees to <br />execute and deliver at Closing an easement deed, in the form of • <br />the attached Exhibit N, granting to the Company (1) an <br />irrevocable, non-exclusive, perpetual easement over and through <br />the Clinton Canal for the transportation of water released from <br />the Reservoir to Tenmile Creek, together with an irrevocable, <br />non-exclusive, perpetual easement for ingress and egress over <br />and across Climax's real property, described in the attachments <br />to Exhibit N, to the Clinton Canal for purposes of access to <br />and maintenance of the Clinton Canal (the "Canal Easement*), <br />and (2)' easements necessary for the construction, operation and <br />maintenance of the Discharge Bypass (as defined in Section 9 <br />below). Climax shall have the right to relocate the Canal <br />Easement to such other locations on Climax's property as it may <br />select, provided that such relocation does not interfere with <br />operation of the Reservoir, and provided that the Company's <br />easement includes an easement over the canal as such may be <br />relocated. In addition, Climax shall assign to the Company any <br />reserved access and other rights created pursuant to the <br />Highway Easement Deeds from AMAX, Inc. to the State Department <br />of Highways, as referenced on Attachment 2 to Exhibit C below. <br />(b) The Company hereby agrees to execute and <br />deliver at Closing an easement deed, in the form of Exhibit O <br />attached hereto, granting to Climax: <br />(1) A non-exclusive, irrevocable easement <br />across a portion of the Reservoir Land described on <br />Attachment 1to Exhibit O for operation and maintenance of the <br />-10-
The URL can be used to link to this page
Your browser does not support the video tag.