My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-08_PERMIT FILE - P2011008 (5)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011008
>
2011-04-08_PERMIT FILE - P2011008 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:29 PM
Creation date
4/11/2011 8:51:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011008
IBM Index Class Name
PERMIT FILE
Doc Date
4/8/2011
Doc Name
New NOI Application Form 2
From
Belleview Land & MIneral Co., LLC
To
DRMS
Email Name
RCO
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Top soil in the area is thin; variable between 1 and 6 in. The soil cover is mostly rocky <br />colluvium. Topsoil, where salvageable, will be stockpiled on the property in a manner <br />esigne o preven erosion an re is n u e uring rec ama ion. erms wl e <br />BLMC. Approximate redistribution depth is 4 in. Best management practices and <br />protections will be employed for the duration of the project. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />All drilling water and additives will be stored in either tanks or on-site mud pits of adequate capacity. <br />ri cores rom a prope y wi e s ore in a asemen o t e ca in on a priva e <br />drill hole option is not available then cuttings will be disposed of on the stockpiles on BLMC private <br />ground in front of the Klondike adit. A three to five feet column of cement will be em[placed in each <br />ri o e a er comp a ion. mec anica pug or ac i ma eria wi a use o suppo a cemen <br />with top soil. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />All Trenches will be refilled with the original removed material, compacted, top soil <br />replaced, and reseeded. <br />DBMS snerifications_ <br />, <br />11. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />other landowner's private land in the area. The planned 700 ft new road on BLMC land is <br />meant to provide secondary access that can be utilized in winter. Snow drift conditions <br />o en oc access on a exis ing on i e rai o e a m in win er. a roa s <br />d, oration of the nr4gjeGt The roads Will not he radai nee <br />n, crc,rn , ? c ,v-?a, csJvvc: , ,
The URL can be used to link to this page
Your browser does not support the video tag.