My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-08_HYDROLOGY - C1996083 (2)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996083
>
2011-04-08_HYDROLOGY - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:28 PM
Creation date
4/8/2011 1:07:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
HYDROLOGY
Doc Date
4/8/2011
Doc Name
Impoundment Yearly Inspection
From
DRMS
To
J.E. Stover & Associates, Inc
Permit Index Doc Type
Sediment Pond Inspect
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOWIE RESOURCES, LLC <br />BOWIE NO. 2 MINE <br />IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly <br />to determine if the impoundment has been maintained as designed, and in accordance <br />with the approved plan and the applicable regulations. This yearly inspection is for the <br />impoundments located at the Bowie No. 2 Mine. <br />On April 2, 2011, 1 performed the required yearly inspection. I, J. E. Stover, have a <br />wide variety experience in the design and construction of earth fill embankments. <br />Nothing was observed during the inspection that would indicate the ponds have a <br />potential for failure. There was no appearance of erosion, instability, structural <br />weakness or other hazardous conditions. There are no required monitoring procedures <br />or instrumentation other than monthly and yearly inspections. There are no aspects <br />which might affect stability. None of the ponds were discharging during the inspection. <br />Pond B had a pool of water about 6-feet below the emergency spillway at approximate <br />elevation of 5946. Because of the water level in the pond, it is not possible to <br />determine the sediment level. It is estimated that Pond B has about 80% of its <br />sediment capacity remaining. <br />The water level of Pond C was at the level of the primary spillway at approximate <br />elevation of 5992. Because of the water level in the pond, it is not possible to <br />determine the sediment level. It is estimated Pond C has had a 25% sediment build-up <br />since it was cleaned out. <br />Pond D had a pool of water standing about 5-feet below the elevation of the emergency <br />spillway at approximate elevation of 5974.7. It is estimated Pond D has had a 10% <br />sediment build-up since it was cleaned out. <br />Pond J was dry with no apparent sediment build-up. <br />Pond K had about was damp with an estimated sediment build-up of 20%. <br />Pond F had about 3-foot of standing water at approximate elevation 5947 with an <br />estimated sediment build-up of 10%.
The URL can be used to link to this page
Your browser does not support the video tag.