Laserfiche WebLink
April 6, 2011 1 <br />Horse Gulch Fill Quarterly Inspection Report <br />First Quarter of 2011 <br />Table of Contents <br />1.0 Introduction <br />2.0 Critical Construction Periods <br />2.1 Removal of All Organic Material and Topsoil <br />2.2 Placement of Underdrainage Systems <br />2.3 Installation of Surface Drainage Systems <br />2.4 Placement and Compaction of Fill Materials <br />2.5 Revegetation <br />3.0 References <br />I certify that this report was prepared by me. <br /> <br />Seth Austin Puls <br />CO PE 41406 <br />Engineering Coordinator <br />Trapper Mining, Inc. <br />gyp. LICFN <br />p?.';?STIAI <br />pG .FQ <br />41406 :.cc <br />. , <br />??FFS310NP? ??? <br />PROFESSIONAL SEAL <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />3 <br />4