My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-06_PERMIT FILE - X201123102
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X201123102
>
2011-04-06_PERMIT FILE - X201123102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:24 PM
Creation date
4/6/2011 12:18:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201123102
IBM Index Class Name
Permit File
Doc Date
4/6/2011
Doc Name
NOI Application
From
Peabody Sage Creek Mining, LLC
To
DRMS
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Flow will the reclaimed diAole locations be marked? Appropriately labeled <br />monument marker placed in the <br />concrete surface plug. <br />PART III <br />The applicant is aware of the following conditions to this Notice: <br />1. No person shall conduct coal exploration activities under Rule 2.02.2 until they have received <br />notification of the Division's determination on substantial disturbance and qualifications as <br />coal exploration. <br />2. A determination by the Division that substantial exploration disturbance of the natural land <br />surface by exploration with removal of 250 tons or less will require that the person who <br />proposes to conduct the coal exploration post a Performance Bond prior to initiation of <br />exploration according to the requirements set forth in Rule 3.05. <br />3. Any person conducting coal exploration activities which the Division has determined will <br />cause substantial disturbance of the natural land surface or which will involve the removal of <br />more than 250 tons of coal shall submit, in accordance with Rules 2.02.6(3) and 4.07.3(3) <br />a. A report for each successive 180-day period during coal exploration activities, no later than 10 <br />days after the end of that period. A report will not be required for 180-dap periods of <br />inactivity. <br />b. A final written report, no later than 30 days after the end of that period for which Notice of <br />Intent was filed or written approval was granted. <br />c. A. Drill Hole Abandonment Report, within 60 days of abandoning a drill hole. <br />(THESE THREE REPORT FORMS ARE AVAILABLE FROM THE DIVISION.) <br />4. The Division may conduct periodic inspections of all coal exploration activities and issue <br />Notices of Violation to any person who is in violation of the Act, or any conditions of <br />exploration approvals. (Rules 5.01.3 and 5.02.2) <br />To the best of my knowledge and belief, all information presented in this application is true and <br />correct. <br />Peabody Sage Creek Mining, LLC <br />Print Name an T' e of Representative <br />Date: `i J <br />Signature of Authorized Representative <br />4
The URL can be used to link to this page
Your browser does not support the video tag.