Laserfiche WebLink
LLI <br />: tS-LrS-?t} 411?4bAde + r ?u. nv, u,?,wuu JV ?. Vp <br />5rJx t . JST : r JKrlk l , l l 1. 61L -? <br />RUG,26.199e 4-'21PM DIViM1T'ERPL686E0l,M000990 P,Z3 <br />T arr.. 10 Bail Rawiff <br />rwavoir deliveries will be conducted in order to compare data it the final report, Climax Meg a depth <br />bomb watem mpline device nude of Teflon to extract samples hem depth in the reservoir. Collectiott <br />and sampling methodologies are allped with the 9amplh* and Analysis Plan (W). submitted in the <br />April 15, 1997 Ea& Park Resatmit data suz=wy forthe resarvolt. <br />Upon a mplction of the flues-year period, it report will be. obrnitted to the DMG that summarizes the <br />data and compares the reservoir water quality with in stream water qty and the applicable <br />standards, An anti-degradation type evaluation will be locludod in this rerpom If the data demOnabrrte <br />that degradation has ocuu:red during the fast throe years of reservoir water delhwy. DWW s <br />eonsideredoa of fittel approval of SX-002 v.V be cuntinwd while iuvestigatiaa is conducted into the <br />sovrec of contadnaats that eaused degradation to occur, The plan far the invex4stion will be <br />developed by Climax and subject to DMG review and approval. If the invearlgsdon dotermimes Hatt <br />the oontimifiwd sowte is related to the operations of to C1 mAx Mine, tho tonne will be mitigated in <br />accoada=e with a plan approved by tho CMG prior to -SR 002 flaal sWoval. If it U detuminued that <br />the $ource of a tc pmbkrn is naturally occurring or the result of near Cl{mmt wtivity, theta to Anther <br />k notion-Is requizsd by Climax. <br />Contiugcmay tonitoring and rasp me will be performed as Mows: <br />> If on eicoed moo olra wawr quality standard is measured in the release ftom Ow Eagle Perk <br />ring shall comtncnce az ei looatxaa downatreatn of the eoufltumoe: <br />' 1%uvrvbX wee My movito <br />betvwsat the reservoir release and the B41e River, fox the parametor(s) which was axcceeded. If <br />` an exceeddice !S pored at the dtty?+ttstrca?m tnr?nitoring location for the setae pataauten(e) for <br />two caeeouttive testa„ DMG wl be notoe d surd Climax will take to ru cuary measures to <br />` 'r detie?rrlrtino figs aoprre'of'?Ma emc,edeuct.`This may include racdtoft the res volz outied, <br />77 raantfotfng withfn, tht reservoir, Yetif cation that the ci*ofl• systems are propedy fum inning. <br />monitoring ups trsam of the reservoir, and other appropriate locations to dctaertrine the potential <br />soutu. <br />e Wee ldy monitoring will coatutuc at the outlet of the Reservoir ad dowwft m of the <br />vontlume of the && River ttrttii it can be demonstrated that no eat ceejeietices occurring <br />arhicb rnsy be causod by the Eagle Park Reservoir delivery or until water quality standards we <br />met for Z'conwdtive weeb, <br />e Arty two coneacatlve excejedencea of the chrortic squatie life wmet quality xtezdwis at the. <br />dO'M elreeom point on the Eaglc River AmU result in an itnmedtete reductfaa of discharge flew <br />setiMcfe nt to utter in an instizun water quality that meets the water quality standards of <br />SegM1013 of rhea F,sgle River. If there is Sum iettt resaon to bout" that art etrnETOCp <br />coaditleui gists related tD aquatic life is the Eagle River, based either on the water quality date <br />"observations or the condition of the aquatic Ufa itself, the, DMG meq require Clbmm to <br />ftumd1stely reduce or discontinue dirlmle from the P41e; Park Reservoir sur It that the water <br />quality star W& will be met, <br /># If It 1s cinftmined that the source of the problem is related to siommes upstream of the reservoir, <br />or mitaitlg maleaial9 intha revervoir, Climax will restore„ as quic)dy as pracamble, operational <br />eontrols on the aeeglo Park Reservoir or tho approved CJ= Smvimmrteatu l Prol*cdon <br />k