My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (41)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (41)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:18 PM
Creation date
4/6/2011 8:43:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 17 & 18
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h? <br />a CM0000886 <br />(c) Regardless of whether or not there is a Closing hereunder and whether or <br />not this Agreement. is terminated, VA shall retain the Enlargement Option. <br />8. The East Fork Pumpback Option. Climax may, in its sole discretion, elect to <br />permit, construct and make operational .a diversion, pump and pipeline facility that can divert <br />6 cfs of water from the East Fork of the Eagle River and deliver such water to storage in Eagle <br />Park Reservoir (the "East Fork Pumpback Facility"). In consideration of the terms and <br />conditions of this Agreement, the Reservoir Company hereby grants Climax the option to obtain <br />the Retained AW Water in exchange for the East Fork Pumpback Facility on the terms and <br />conditions set forth herein (the "Pumpback Conversion Option"). The Pumpback Conversion <br />Option shall have a term of, and shall expire if not exercised within, 89 years from the date of <br />X ` this Agreement. The Pumpback Conversion Option may only be exercised if all of the following <br />have occurred: (a) a Closing of the Project Rights has or simultaneously occurs as set forth in <br />' paragraph 6 above; (b) Climax has successfully permitted, constructed and made operational the <br />East Fork Pumpback Facility in compliance with the specifications set forth on Exhibit N <br />attached hereto; (c) Climax is not in breach of any of its obligations under this Agreement or any <br />document executed at Closing; (d) Climax and the Reservoir Company have obtained a final <br />decree, not subject to appeal, adjudicating the East Fork Pumpback Facility as an alternate point <br />of diversion for the water rights decreed in Case No. 92CW340; and (e) Climax and the <br />Reservoir Company have obtained a final decree, not subject to appeal, designating the East Fork <br />Pumpback Facility as an alternative point of diversion for the exchange rights decreed in Case <br />C, <br />No. 95CW348.. The Pumpback Conversion Option must be exercised, if at all, by written notice <br />r delivered to the Reservoir Company within the term of such option. At the closing upon exercise <br />of such option, (a) the Reservoir Company shall convey the Retained AW Water to Climax by <br />special warranty deed, free and clear of all liens, encumbrances, leases, contracts, assessments, <br />charges or interests, using the form of deed attached hereto as Exhibit O, and (b) Climax shall <br />convey the East Fork Pumpback Facility to the Reservoir Company, together with easements and <br />rights of ingress and egress thereto adequate for operation of the facility, all by special warranty <br />deed, free and clear of all liens, encumbrances, leases, contracts, assessments, charges or <br />interests, together with all permits thereto. <br />9. , eepap Pumpback Facilities. (a) Climax has constructed and maintained a <br />pond located approximately 300 feet below the toe of Dam 4 which captures groundwater, <br />seepage or other water escaping from Eagle Park Reservoir. Water from this pond is pumped <br />back to Robinson Reservoir or Climax's industrial process water system by means of an existing <br />pipeline. The foregoing pond, pipeline and pumpback system are hereinafter collectively <br />referred to as the "Dam 4 Seepage Pumpback Facility." The Dam 4 Seepage Pumpback Facility <br />is not included among the Project Rights being purchased pursuant to this Agreement, and <br />Climax shall be solely responsible for the operation and maintenance of the Dam 4 Seepage <br />Pumpback Facility. Climax further agrees that it shall continue to operate and maintain the Dam <br />4 Seepage Pumpback Facility at any time that water captured by any component of the Dam 4 <br />Seepage Pumpback Facility does not meet the water quality standards of the East Fork of the <br />Eagle River as determined by the Colorado Department of Health; provided, however, that with <br />f fd2669 "7" <br />1, 1111111 IIIII 1111111 IIII IIIIIlIIIII Ilill III Illll IIII IIII <br />666203 08/17/1998 03:10P 23 Sara Fisher <br />7 of 112 R 361.00 D 0.00 N 0.00 Eagle CO <br />0 4 <br />Nm? <br />OD =_ <br />?NS• <br />mC? <br />s, <br />vm? <br />m?- <br />ao? <br />aa- <br />z oo <br />601 <br />Nr N ? <br />m a? <br />o <br />A <br />x <br />
The URL can be used to link to this page
Your browser does not support the video tag.