My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (41)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (41)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:18 PM
Creation date
4/6/2011 8:43:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 17 & 18
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM0000919 <br /> <br /> 7. Such other applications as may be necessary to <br /> effect the chosen alternative. <br />A <br />? Such cooperation shall include participation as co- .,w <br /> applicants in any required water court applications; m.? <br /> provided, however, that this provision shall not constitute <br /> an encumbrance-or obligate a part to continue the existence <br /> of the foregoing water rights. <br /> m m= <br /> <br />D. Excess Water Rights. 99 <br />v <br /> <br /> Upon the development of the full project for the Cities m <br /> <br />? <br />provided for in Section IV.B.2. above, the Cities shall ao <br />z w? <br />r dedicate to the joint use project all of its remaining ? <br />- <br /> Eagle River conditional water rights or dedicate such 0 <br /> rights for nonconsumptive uses, such as environmental ? <br /> mitigation. There shall be no additional diversions to a a •m <br /> the cities under these rights and no transfer of the 0 <br />».-- rights for use out of the basin. <br /> <br />Y, IX. PROJECT COST SHARING. <br /> <br /> During Phase 2 of the study, the parties shall seek to reach <br /> an agreement regarding the sharing of costs for the <br /> construction, operation and maintenance of the subsequent <br /> phases of the project. <br /> X. MUTUAL COOPERATION. <br /> The parties agree to discuss on an annual basis means to <br /> utilize Eagle Park Reservoir or other Reservoir Company <br /> facilities in conjunction with the then existing Homestake <br /> Project or other facilities owned by,the-Cities, through . <br /> exchange or otherwise, for the mutual benefit of the <br /> parties. <br /> XI. SUCCESSORS AND ASSIGNS. <br /> The provisions of this MOU shall apply to, and be binding <br /> upon, the successors and assigns of the parties hereto. Any <br /> assignments of interest hereunder shall be in writing, with <br /> notification thereof promptly provided to all parties. <br />4 <br />s:\1ega1\mtp\water\aur-cs2.mou 19 I I"?II'?III "I'lll "II I'?'I ?I'Ili II'?I I'I II?'? III I <br />666203 08/17/1998 03:10P 23 Sara Fisher <br />40 of 112 R 661.00 D 0.00 N 0.00 Eagle CO
The URL can be used to link to this page
Your browser does not support the video tag.