My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (41)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (41)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:18 PM
Creation date
4/6/2011 8:43:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 17 & 18
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> CM0000907 <br /> <br /> shall be under no obligation to contribute money, <br /> land, completed infrastructure, water or water oNoI.- <br /> rights to such subsequent project phase or- o w <br /> participate in the ditch and reservoir company <br /> identified in Section VII with respect to such <br /> subsequent project phase. Notwithstanding the m . <br /> foregoing, the remaining provisions of this MOU co <br />j shall remain in effect. 0 W <br /> <br /> <br />1 E. Study Cost Sharing m <br /> ma- <br /> <br />1. Part 1 -- Cost of outside engineering consultants a = <br />zinnNOME <br />f jointly retained by the parties will be split 25% m <br />` by the Cities, 25% by Climax, 25% by the m w <br />j Consortium, and 25% by the River District up to a a41= <br /> maximum of $10,000 each. Each party to pay for <br />th <br />t <br />f th <br />i <br />lt <br />t a ae? <br /> e cos <br />s o <br />an <br />s. <br />e <br />r own consu c <br /> 3 <br /> 2. Parts 2 and 3 -- Cost of outside engineering <br /> <br />consultants jointly retained by the parties to be A <br /> split according to percentage of project yield to <br /> be acquired by the parties. <br /> IV. YIELD. <br /> A. Definition. <br /> 1. Firm dry year yield-- available in the 25% driest <br /> of years during the Study Period. <br /> 2.. Average yield -- available for diversion on a 25 <br /> year rolling average. <br />B. Requirements. <br />1. Reservoir Company.-- up to 10,000 acre feet of <br />firm dry year yield. <br />2. Cities -- up to an average of 20,000 acre feet of <br />yield that is available and diverted for use on a <br />25 year rolling average, plus such additional <br />increment as allowed under paragraph IV.C.3.d. <br />3. Climax -- up to 3,000 acre feet of storage space. <br />s:A1e9a1\mtp\water\aur-cs2.mou <br />666203 08/17/1998 03:10P 23 Sara Fisher <br />28 of 112 R 561.00 D 0.00 N 0.00 Eagle CO <br />Y t•
The URL can be used to link to this page
Your browser does not support the video tag.