My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REVISION - M1977493 (67)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-14_REVISION - M1977493 (67)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:18 PM
Creation date
4/6/2011 8:42:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/14/2011
Doc Name
Exhibit List, Exs. 10 & 11
From
Climax
To
MLRB
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
503635 B-607 P-553 04128193 13: 44;M000P@O 30 OF 99 <br />(f) Election to Exercise and Closing. VA may elect <br />to exercise the Enlargement Option, wholly or in any number of <br />increments thereof (not previously waived), by delivery of <br />written notice to Climax of its election to so exercise prior <br />to the expiration of the applicable period of the option term. <br />_ Within 30 days of such notice, Climax shall cause Shares to be <br />R issued to VA. representing the quantity of dater VA has so <br />s elected to purchase, and VA shall concurrently pay such <br />amounts as provided herein in cash or certified funds to <br />Climax. Such Shares issued to VA shall be free and clear of <br />all liens, encumbrances, leases, contracts, assessments, <br />charges or interests. <br />3.9 EPR Construction & Company Formation Expenses. <br />• <br />(a) 5-Year Warranty Period. Subject to the CY. <br />provisions of Section 4.13, Climax shall have a continuing <br />duty and obligation to pay all reclamation, permitting, ; <br />modification, repair and construction costs associated with <br />. y. <br />Eagle Park Reservoir for a period of five years from the date °w <br />of exercise of the EPR Conversion Option (the 05-Year <br />Warranty"). The 5-Year-Warrarity shall include, without <br />limitation, any and all costs associated with water quality <br />problems, the dam embankment,.the outlet works and spillway, <br />excluding normal operating costs. • <br />(b) Construction, OM &R of Eagle Park Reservoir. Any <br />and all reclamation, construction, enlargement and OM&R of <br />Eagle Park Reservoir shall be made..by Climax in accordance <br />with applicable federal, state and local dam safety, <br />environmental, permitting and inspection requirements.. Climax <br />hereby agrees to indemnify and hold VA and the Company <br />harmless for any loss, cost, liability or.expense resulting <br />from the reclamation, construction, enlargement or OM&R of <br />Eagle Park Reservoir by Climax, its agents, employees or <br />contractors, or from any failure of the Eagle Park Reservoir <br />dam resulting from such activities. <br />(c) EPR Water Facilities. Climax shall bear all <br />costs and expenses associated with the reclamation, design, <br />construction, and procurement of any necessary governmental <br />approvals or permits in connection with Eagle Park Reservoir <br />and the EPR Water Facilities through the 5-Year Warranty <br />period, and Climax shall bear all costs and expenses <br />associated with any enlargement of Eagle Park Reservoir at any <br />time. <br />PUD:b09 -22- <br />•
The URL can be used to link to this page
Your browser does not support the video tag.