Laserfiche WebLink
Permit Amendment (AM-06) - Climax Mine <br />CM0000707 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />Demolition 3 - AM06 new structures at buildout <br />Total Cost <br />$3,206,386 <br />_AM .>° <br /> Pro'ected Climax <br />Bldg # Facility Desi nation Dimensions Material Volume / Size Unit Costs Estimated/ <br /> L W H Actual Cost <br />New Mill and Concentrator Buildin s feet <br />[These dimensions were provided b FM I's Jon Quam August 26, 2008 in a meeting at Climax Min .1 <br />Added 8-27-08 Grinding Building 225 180 110 STEEL 4455000 CU.FT $0.25 $1,113,750 <br /> <br />Added 8-27-08 Flotation Building 250 225 90 STEEL 5062500 CU.FT $0.25 $1,265,625 <br /> <br />Added 8-27-08 Administration Building 180 125 30 STEEL 675000 CU FT $0.25 $168,750 <br /> <br />Added 8-27-08 Warehouse Building 150 125 30 STEEL 562500 CU FT $0.25 $140,625 <br /> <br />Added 8-27-08 Laboratory Building 175 120 30 STEEL 630000 CU.FT $0.25 $157,500 <br /> <br />Added 8-27-08 Reagent Building 125 30 30 STEEL 112500 CU FT $0.25 $28,125 <br /> <br />Structures Not Included in Previous Estimates <br /> <br />Added 8-27-08 Explosives Shed Powder Storage) 13 8 8 STEEL 832 CU FT $0.25 $208 <br /> <br />Added 8-27-08 Explosive Storage Old Box Cars - 3 41 10 10 STEEL 12300 CU FT $0.25 $3,075 <br /> <br />Added 8-27-08 Warren's Pump Station 30 25 14 STEEL 10500 CU FT $0.25 $2,625 <br />meas 9-5-08 <br />Added 8-27-08 Sludge Densfiication Plant 148 115 48 STEEL 814200 CU FT $0.25 $203,550 <br />meas 9-5-08 <br />Added 8-27-08 Clarifier a rox cone 165' Dia & 14' Dee Cone STEEL 386000 CU FT $0.25 $96,500 <br />meas 9-5-08 <br />Added 8-27-08 3-Dam Pump Station 63 30 30 STEEL 56700 CU FT $0.25 $14,175 <br />meas 9-5-08 Small Out-Building at 3-Dam Pump Station 14 12 9 STEEL 1512 CU FT $0.25 $378 <br />Added 8-27-08 Train Shack at Ten Mile North Portal 50 20 14 STEEL 42000 CU FT $0.25 $10,500 <br /> <br /> Totai for this Spreads heet = $ 3,205,386 <br />• <br />• <br />• <br />Exhibit L Feb 2011