Laserfiche WebLink
Perms Amendment (AM-0e) - Climax Mine <br />CM0000700 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />• Financial Resorting Unit Rates <br />Hydrologic Protection <br />Total Cost <br />$19,746,576 <br />Calculations <br /> <br />• <br />Items Quantity Units Unit Cost Total (annual) Comments <br />Labor (water/maintenance) 4 $60 <br />000.00 $240,000 Assumes 4 water/maintenance operators on rotating shifts <br /> each , <br /> 1 Site Supervisor for the management of the crew and <br />Site Supervisor 1 each $80,000.00 580,000 site <br />Lime 10,000 $150.00 $1,500,000 Assumes consistent lime usage for treatment post mining <br /> tom <br />Sulfuric Acid 4 $6,000.00 524,000 Assumes consistent acid usage for treatment post mining <br /> loads <br />Other Reagents (polymer) 000 <br />61 $2.00 $122,000 Assumes consistent polymer usage for treatment post mining <br /> , pounds <br /> S1.2M per year currently. Assume 75% post closure for <br />Power - - S900,000 pumping and treatment svstems <br /> S630K per year currently. Assume 509% post closure for <br />Natural Gas - - $315,000 remaining buildings <br />Vehicles 2 $7,500.00 $15,000 Pickups for access to remote water system check points <br /> each <br /> Loader for mad maintenance, snow plowing and general <br />Loader 1 each 560,000.00 $60,000 maintenance <br />Pump Maintenance - $200,000.00 $200,000 Regular maintenance and service of installed pump sets <br /> Snow plowing for access to system in winter and repairs in <br />Road Mantenance - $150,000.00 $150,000 summer <br />Building Maintenance - $150,000.00 $150,000 Roofs, I-IVAC. domestic water and waste water <br />Electrical Maintenance - $100,000.00 $100,000 Programing, electric motors, power maintenance, radios <br /> Costs based on treating 10,000 acre-ft per year from Climax <br />Total Water Treatment Costs $3,856,000 2010 Budget - Cost per acre-foot = $385.60 <br />Extended cost estimate for Hydrologic Protection - 8 years <br /> Quantity Units Unit Cost Total (annual) Extended Cost <br />First five years of treatment 8,100 acre-ft $385.60 $3,123,360 $15,616,800 <br />Subsequent three years of treatment (70% <br />reduction of quantity) 3,570 acre-ft $385.60 $1,376,592 $4,129,776 <br />Total for 8 year Hydrologic Protection $19,746,576 <br />Source: Climax Mine Engineering Dept 2010 <br />Exnlbft L <br />Feb 2011 <br />