Laserfiche WebLink
Parma -1 (--) Mina <br />CM0000698 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Raoorting Unit Rates <br />Other Reclamation Costs <br />.Total Cost <br />$8,732 Seal Underground Mine Openings <br />$1,164,205 RevegetatlonBReseeding <br />$964,316 Haul Equipment Requiring Assembly/Disassembly <br />$374,636 MoblllratioNDemobilization <br />$0 Job Superintendent <br />$1,434,840 Buffer ZOne <br />$19,746,576 Hydrologic Protectlon <br />$521,178 Maintenance & Environmental Control Tasks <br />$24,214,482 <br />Calculations <br />ILL <br /> arsquare test Submral <br /> Storks Portal - 12k04' 168 $35 $6,323 $5,880 <br /> No. 5 Shah - 234' Diameter 428 $50 $0 $21,400 Stays <br /> No.7 Shaft -28'Diameter 615 $50 $0 $30,750 Completed <br /> No.3 Gallery -8'x8' 64 $35 $2,409 $2,240 <br /> TOTAL $8,732 $60,270 Inflated from 2006 to 2010 $ by 1.07535 <br />The following revegetattoo cost estimates are based on 2008 costs. They Include materials and labor tar revegetation, but do not micude: <br />11 hewing/plecement ofsoil <br />2) hauling/plecemrnt/incorpomtion of lime <br /> <br />Area <br />Seed Bed Prep <br />Seeding <br />Seed Mixture Hydromulch (Inc <br />materials) <br />Total <br />Revegetation Category Atli Acres Steep Cost/- Method Cost/acre Seed Mix Cost/acre Cost/acre <br />Standard 1,562 S 180 rector Bmadca S 13000 Standard S 190 a/a Soo S ,000 <br />Standard Ste 12.5:1 35 Na H dro-I S 150.00 Standard S 190 S 18% 050 <br />Al ine 322 $ 180 moor Broad S 130.00 Al ine S 150 Na 120 <br />M <br />AI ine St 12.5:1 60 yes Ne H droned S 150.00 Alpine S 150 $ 1,890 2,190 ,160 <br />$ <br />Wefland 25 no Hand Broadcast $ 19500 H dric S 300 ,875 <br />onl 205; <br />vv TOTAL $1,164,205 <br />W 9 Ipiiib k4iip9. /D H'-ice r ?, : ti _ _ .a',?y.`?_ ...v.rc •, ? ,.._ _? <br /> Yea r1 $214,253 <br /> Yea r2 $214,253 <br /> Year3 $214,253 <br /> Year4 $214,253 <br /> Year 5 $107,305 <br /> TOTAL $964,316 <br />68® ?TL .., <br /> Year 1 $68,644 <br /> Yea r2 $60,843 <br /> Veer 3 $60,843 <br /> Year4 $60,843 <br /> Year 5 $55,949 <br /> Years 6-10 $67,513 <br /> TOTAL $374,636 <br /> <br /> Area E u enl Hours Supervisor Hours <br /> 1 Storke Complex 268.64 54 <br /> 2 Open Pit 600.67 120 <br /> 3 Mine & Mill Complex 7,584 1517 <br /> 4 E+F Waste Rock Dumps 845 169 <br /> 5 McNulty Waste Rock Dump 23,156 4631 <br /> 6 McNulty Cutoff Wall +Dike 203 41 <br /> 7 Tenmile TSF 11,561 2312 <br /> 8 Tenmile Tunnel Sealing+ Bulkhead Construction 0 0 <br /> 9 3 Dam 15 3 <br /> 10 Pond Shop Area 15 3 <br /> 11 Mayflower TSF 6,655 1331 <br /> 12 East Side Channel Construction 0 0 <br /> 13 Mayflower Add Treatment Facility 191 38 <br /> 14 Robinson TSF 1,861 372 <br /> 15 Eagle Valley Borrow Areas 0 <br /> 16 Clinton Gulch 0 <br /> 17 Roads - Reclamation of Various Segments 677 135 <br /> 18 Arkansas River Channel - New Channel at Storke Area 0 0 <br /> 19 Arkansas River Diversion Channel - Removal of Acid Rock 680 136 <br /> 20 Robinson Lake 0 0 <br /> 21 Tenmile Sludge Cell 825 165 <br /> 22 Lake Irwin 100 20 <br /> 23 Underground Openings 0 0 <br /> 24 Decants 232 46 <br /> 25 Interceptors-decommission only 1,062 212 <br /> 26 CAVR 44 9 <br /> 27 West Gravity Line 0 0 <br /> TOTAL 56,575 11,315 <br />B <br />M <br />ACRES cae ih <br />115 Reclaim the Buffer Zone 550 $2,609 $1,434,840 <br /> TOTAL $1,434,840 <br />aka ongoing Water Treatment O&M <br />104 Rill and gully maintenance <br />105 Road maintenance <br />106 Dust control <br />107 Interceptor Drainage Control <br />$0 <br />$199,240 <br />$199,240 <br />$199,240 <br />$199,240 <br />$99.786 <br />$896,746 Inflated from 2006 to 2010 $ by 1.07535 <br />$63,834.2 <br />$56,579.9 <br />$56,579.9 <br />$56,579.9 <br />$52,028.9 <br />$62,782.4 <br />$348,385 Inflated from 2006 to 2010 $ by 1.07535 <br />$1,434,840 <br />$1,434,840 Inflated from 2006 to 2010 $ by 1.07535 <br />8,100 am feet x 5 yearn x $385.60/acre foot = $15,616,800 $11,000,000 <br />3,570 am feet x 3 years x $385.60/acre foot = 54,129,776 $3,330,000 <br />TOTAL $19,746,576 $14,330,000 <br />$33,585 $31,232 <br />$31,687 $29,467 <br />$37,637 $35,000 <br />$418,268 $388,960 <br />TOTAL $521,178 $454,659 Inflated from 2006 to 2010 $ by 1.07535