Laserfiche WebLink
Permit Amendment (AM-06) - Climax Mina <br />CM0000692 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />Roads - Reclamation of Various Segments <br />Assumptions: <br />(1) CAVR asbestos disposal facility reclamation is covered elsewhere - access road covered herein. <br />(2) Bartlett Mountain Road will be reclaimed with an excavator "pulling-up" road fill and biosolids will be replaced on this area since it is a highly visible and difficult reclamation <br /> site. <br />(3) No growth media will be required on the remaining areas; existing soils are assumed to be adequate to support vegetation. <br />(4) Grading and ripping on the roads can be accomplished with a D7 dozer. <br />(5) Revegetalion is covered elsewhere. <br />Tasks: <br />(7) Reclaim various roads site-wide with subsoil (6••) and topsoil/biosolids (6•') - see Soil Quantities spreadsheet Feb 2010 by HMI - approx 16.37 acres for subsoil and 16.37 arras <br /> for topsoil/blosolids <br />Timing <br />End of Mine Life <br />Total Cost <br />$174,490 <br />Calculations <br />Inltlal C-LU <br />d of 1' Sl•rell ;'t " `t 4Cori Unit Total Equip C-stmt : Total Labor nit Total <br />Tan WAra Volum t Qty 1- UnT, Produ flmi r Units ,HrS Rcq d rd aterlal. Total Cost <br />'?,Equlp Factor Equip Cost t Labor Cost Matcrl Coal % <br />al5 <br />COVER WITH 6" SUBSOIL <br />Loading Subsoil on trucks with Cat 916 Loader 1 13,205 cy Based Upon # Trucks 66.03 $58.86 $3,886 $30.40 $2,007 $5,894 <br />Hauling Subsoil with Cat 730 Trucks (2) 2 13,205 cy 100 cy/hr 132.05 $127.54 $16,841 $30.02 $3,964 $20,805 <br />Tramming Subsoil to replacement area with Cat 936 Loader 1 13,205 cy 45 cy/hr 293.45 $58.86 $17,272 $30.40 $8,922 $26,194 <br />Spreading Subsoil with Cat 330 Excavator 1 9,440 It 105 fl/hr 89.90 $129.16 $11,612 $30.21 $2,716 $14,328 <br />COVER WITH 6" TOPSOIL <br />Loading Biosolids on trucks with Cat 916 Loader 1 13,205 cy Based Upon # Trucks 165.06 $58.86 $9,715 $30.40 $5,019 $14,734 <br />Hauling Biosolids with Cat 730 Trucks (2) 2 13,205 cy 40 cy/hr 330.13 $127.54 $42,103 $30.02 $9,910 $52,014 <br />Tramming Biosolids to replacement area with Cat 936 Loader 1 13,205 cy 45 cy/hr 293.45 $58.86 $17,272 $30.40 $8,922 $26,194 <br />Spreading Biosolids with Cat 330 Excavator 1 9.440 ft 105 ft/hr 89.90 $129.18 $11 a12 $3021 $2.716 $14.328 <br />_ _ <<?^ a _ r r_ r w1- . z.Nr Rr 1 d ::_ 1 010 r) i t, r c=. H Ibi Li3i,or i'.o°t Total Yet ,tiai ( Total :cst' <br />TOTAL COSTS 1,46O $ 130,314 44,177 5 - $ 174,490 <br />_"'cat. •