Perri Amendment (AM-06) -CO.. Mors <br />CMC000686 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />East Side Channel Construction I N= <br />Across Tenmile and Mayflower TSFs <br />Assumptions: <br />(1) Construction of the East Side Channel will be done in a manner similar to the completed portions that were done on Robinson TSF in 2005. <br />(2) Knowing the costs for Robinson's East Side Chann el, it can be assumed these numbers are applicable to Tenmil e and Mayflower. <br />(3) Preliminary engineering has not been performed for the channel or structures: however, in a phone conversation with Steve May (Wheeler & Assoc) on 11-3-05 it was discu ssed that <br /> the channels wig be similar across Tenmile and Mayflower, <br />with a slightly larger cross-section but not as much volume in the cut sections. Similarly, there will be a need to build spillways for Tenmile and Mayflower and they will be "roughly <br /> equivalent" to Robinson's. <br />(4) This analysis assumes that mob/demob of equipment will be covered elsewhe re and project administration is also covered elsewhere. <br />Tasks: <br />(1) Construct Channel through Tenmile TSF and Mayflower TSF. <br />(2) Construct 3 Dam Spillway and 5 Dam Spillway. <br />Timing <br />2011+ <br />Total Cost <br />.. .. 54,478,931 <br />Calculations <br />T?ekiArev - u, Units C, <br />Y ?t Unit F <br />q??P Tat1 Equip C LUn t T t 1 Lab- Cont'Unit Total hla lerlal <br />Total Cost Comment <br /> - aet - <br />C Iabor Goat <br />hln to riots <br />Go51 <br />Construct Main Channel - Tenmile 7,500 ft $63.45 $356,882 $118,961 $475,842 Based on Nielson's Cost for Robinson East Side Channel <br />Construct Discharge Channel - Tenmile 1,000 If $126.72 $95,036 $31,679 $126,715 The original costs in 2005 have been inflated to 2009 dollars <br />Geotextiles (fumish It install) 30,000 sq yd $2.08 $31,189 $31,189.25 $62,379 <br />Rip Rap Armoring along Channel Route 3,000 cy $30.75 $92,248 $92,248 <br />Ten Mile Pond Connecting Channel 1,000 it $160.42 $120,318 $40,106 $160,424 <br />HOPE 63" pipe and bedding (furnish & install) 600 it $378.45 $56,768 $56,768 $113,535.48 $227,071 <br />HOPE 42" pipe and bedding (furnish & install) 600 it $177.12 $26,569 $26,569 $53,137.25 $106,274 <br />_ Relocate Adjacent Pipelines 2,000 fl $41.81 $62,709 $20,903 $83,611 <br />('r^rrHr Fr - 0-, (t.dat. -01.1 5?4h.•.?vs, ?rr1 I 1. S 544- n6m $44 nne s1 1n n15 a?pp - nn 5440 -n <br />Subtol?l ,. ? $762, 2m7.06 $436.16E.65 _ $576,146 56 -; .. $1.774 624 <br />Construct Main Channel - Mayflower 12,500 It $63.45 $594,803 $198,268 $793,071 Based on Nielson's Cost for Robinson East Side Channel <br />Construct Discharge Channel- Mayflower 2,000 It $126.72 $190,073 $63,358 $253,431 The original costs in 2005 have been inflated to 2009 dollars <br />Geotextiles (furnish & install) 50,000 sq yd $2.08 $51,982 $51,982.09 $103,964 <br />Rip Rap Armoring along Channel Route 5,000 cy $30.75 $153,746 $153,746 <br />Mayflower Pond Connecting Channel 2,000 It $160.42 $240.636 $80,212 $320,848 <br />HOPE 63" pipe and bedding (furnish & install) 1,000 it $378.45 $94,613 $94,613 $189,225.80 $378,452 <br />HOPE 42" pipe and bedding (furnish & Install) 1,000 It $177.12 $44,281 $44,281 $88,562.08 $177,124 <br />. Relocate Adjacent Pipelines 2,000 It $41.81 $62,709 $20,903 $83,611 <br />r -I. Stmrtn- (Inlet, nnnet Spifl-ys ptel 1 1 s $440,060 $44,006 $110, oi5 5286,039 n0 $440,060 <br />Sribfot?l 51271;120 $563,631.11 $765,554.93 $2,704,306 <br /> T r,i,l Equip ,Cos•. ,. T,-I ator COel TCUI Cost. <br />DOTAL COSTS °' - -$2,033,407 " $1,099,820 $1,345,703 : $4,478,931 <br />?b4 L <br />•