Laserfiche WebLink
Parma A-di,e i (AM-06) - CBnax Mina <br />CM0000684 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />Mayflower TSF <br />Assumptions: <br />(1) Trucks, Loader, and Dozen in 2000 Reclamation Cost Estimate are reasonable (Only change to 2000 cost estimate are equipment 8labor rates) <br />(2) Soil Replacement Thickness is 30" over 25% of (wet) cover area 10 12" over 75% of (dry) cover area. Swell Factor - 1.215 from 2000 Cost Estimate <br />(3) Revegetalion is covered elsewhere <br />Task.: <br />Haul and spread can material to Tenmile: <br />(1) Place geogrid on wet cover area = (167-67)ac. = 100 acres. Assumes long-term pond area - equivalent to Tenmile Pond reduction (234->9e ac). <br />(2) Hauling and placement of e" biosolidsAopsoll over 6* subsoil over 24' local cap material (channel spoils, etc.) for lwet" cover (100 ac). <br />OR (3) Hauling and placement of 6" biosolidsltopsoil over 6" subsoil for'dry" cover (100 ac estimate). <br />Timing <br />2011+ <br />Total Cost <br />$3,075.787 <br />Calculations <br />C.": unit - 10111 L V Corl,1Jt T-1 M111-1 <br />Ta kNre1 M of It I S N ply _U 1 . Nrod 1 'Un t II r R,j 4 Coal'Un t Eq, ?. Tr fat Erl ?? Co 1 _ 7 111 Coef <br />_ Ey,rin Voi,,- "Factur -l L-1 Cott Malerlrl? Cott <br />% <br />WET COVER CONSTRUCTION: <br />Geogrid Placement on Soft Tailing (100 ac) 484,000 sq yds $ 1.87 $902,807 $902,807 <br />Haul and Place 6" topsoi9biosolids over 6" subsoil over 24" local cap material 1100 ac) <br />CAT 7778 Haul Truck 4 484,000 1.000 484,000 (Cy) 193.94 (.or) 2,49e $371.23 $926,436.28 $30.02 $74,916.68 $1,001,353 <br />CAT 992C Loader 1 Trucks Per Loader 4 624 $513.20 $320,186.53 $30.40 $18,969.55 - $339,156 <br />DBN Dozer 1 624 $179.86 $112,215.43 $33.81 $21,091.22 $133,307 <br />14G Grader 1 624 $118.09 $73,677.28 $32.37 $20,197.76 $93,875 <br />Water Truck 1 624 $09.43 $43,314.56 $30.02 $18,729.17 $62,044 <br />Support Equipment Includes: D8N Dozer, 14G Grader d Water Truck <br />DRY COVER CONSTRUCTION: <br />Haul and Place 6" topsoiliblosolids over 6" subsoil (100 ac) <br />CAT 777B Haul Truck 4 161,333 1.000 161,333 ley) 193.94 (cy1110 832 $371.23 $308,812.09 $30.02 $24,972.23 $333,784 <br />CAT 992C Loader 1 Trucks Per Loader 4 208 $513.20 $106,728.84 $30.40 $6,323.18 $113,052 <br />DBN Dozer 1 208 $178.86 $37,405.14 $33.81 $7,030.41 $44,438 <br />14G Grader 1 208 $118.09 $24,559.09 $32.37 $6,732.59 $31,292 <br />Water Truck 1 208 $69.43 $14,438.19 $30.02 $6,243.06 $20,681 <br />Support Equipment Includes: DBN Dozer, 14G Grader d Wafer Truck <br /> Ii, Rey1 7 IF.iill. Cr.? fcla(4ebor Cog, lclal lfilaral Cos 'otel Cn-•, <br />TOTAL COSTS 6,655 - $ 1,967,773 $ .205,206' $ 982,807 ; 31075,787 <br />9.1-