My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-04_REPORT - C1981010 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2011-04-04_REPORT - C1981010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:22 PM
Creation date
4/5/2011 8:58:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REPORT
Doc Date
4/4/2011
Doc Name
Semi-Annual Geotechnical Monitoring Report - March 2011
From
Trapper Mining Inc
To
DRMS
Permit Index Doc Type
Stability Report
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />March 31, 2011 <br />TttAPPER KtMN& INC. <br />Mr. Rob Zuber, PE <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Dear Mr. Zuber: <br />RE: Semi-annual Geotechnical Monitoring Report - March 2011 <br />RECEIVED <br />APR 0 4 2011 <br />Division or ixeclama n, <br />Ahin!ng nrd Su:f l <br />Trapper began submitting semi-annual monitoring reports to the Division, beginning in March 2008 with the <br />last report sent on September 30, 2010. Trapper has been monitoring the 2006 landslide area for movement <br />through the use of a continuous monitoring system, described in the last report. <br />This report contains the following information: <br />In your letter acknowledging receipt of the September 2010 report (dated December 6, 2010), you requested <br />information concerning depth of installation for sensors at Station 5. Inclinometers were placed at the LL, the <br />K, and the R seams. Piezometers were placed at the LL and M seams. <br />Section 3.3.3 of Trapper's permit details the initial configuration of the monitoring system; this report updates <br />the configuration of the monitoring system. Since September's report, Station 3 has been removed due to the <br />normal advance of mining operations. Station 6 will be established with a borehole and installed sensors this <br />summer. The location and installation details will be included in the September 2011 report. <br />Inclinometer graphs for Stations 2 through 5, covering the period October 15, 2010 through March 30, 2011 <br />(with the exception of Station 3, ending March 8, 2011), are attached. Movement is measured in inches of <br />displacement and represents rotation of inclinometer casing. Beginning values can be seen at the October 15th <br />point on the graphs. There has been no significant movement in the inclinometers during the monitoring <br />period. <br />Piezometer reading graphs for each site are also attached, and cover the same time period as the inclinometers <br />above. <br />Stations 2 and 4 currently have GPS monitoring stations. Displacement histories for these sites, and for site 3, <br />for the period of October 1, 2010 through March 29, 2011 are attached. <br />Please contact me if you have any questions. <br />Sincerely, <br />eth A. uls, PE <br />Engineering Department Coordinator <br />c FVL <br />P.O. Box 187 Craig, Colorado 81626 (970) 824-4401
The URL can be used to link to this page
Your browser does not support the video tag.