My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-01_INSPECTION - C1982057
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982057
>
2010-11-01_INSPECTION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:20 PM
Creation date
4/5/2011 8:58:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
INSPECTION
Doc Date
11/1/2010
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
9/21/2010
Email Name
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. KEP'I'. OF THE INTERIOR <br />4 OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person SENECA COAL CO. Number C-057-82 Date 09/21/2010 Continuation Page <br />28. Performance Standard Categories <br />Codes: ]=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, 5=Noncompliance Identified Elsewhere, 6=Previously Cited <br />A. Administrative <br />1. Mining within Valid Permit <br />_ <br />2. Mining within Bonded Area <br />_ <br />3. Terms & Conditions of Permit <br />_ <br />4. Liability Insurance <br />_ <br />5. Ownership and Control <br />_ <br />6. Temporary Cessation <br />- <br />7. AML Rec. Fees -- Non-Respondent <br />_ <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2. Inspections & Certifications <br />3. 1 Siltation Structures <br />4. 1 Discharge Structures <br />5. Diversions <br />6. Effluent Limits <br />7. Ground Water Monitoring <br />8. Surface Water Monitoring <br />9. Drainage -- Acid-Toxic Materials <br />10. Impoundments <br />11.- Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1. Removal <br />2. Substitute Materials <br />3._ Storage and Protection <br />D. <br />Backfilling & Grading <br />1._ Exposed Openings <br />2. Contemporaneous Reclamation <br />3. 1 Approximate Original Contour <br />4. 1 Highwall Elimination <br />5. 1 Steep Slopes (includes downslope) <br />6. Handling of Acid & Toxic Materials <br />7. Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1. 1 Placement <br />2. 1 Drainage Control <br />3. 1 Surface Stabilization <br />4. - Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1._ Drainage Control <br />2. Surface Stabilization <br />3. Placement <br />4. Inspections and Certifications <br />5. 3 Impounding Structures <br />Use Of Explosives <br />1. Blaster Certification <br />2. Distance Prohibitions <br />3. Blast Survey/Schedule <br />4. Warnings & Records <br />5. Control of Adverse Effects <br />E. <br />F. <br />G <br />Performance Standard Catagories <br />30 CFR Counterpart <br />A. Administrative ......................................................................... <br />1. Valid Permit .....................................................................................773.11 <br />2. Mining within Bonded Area ................................................773.11 <br />3. Terms & Conditions of Permit .............................................773.17 <br />4. Liability Insurance ................................................................800.60 <br />5. Ownership and Control ........................................................778.13 <br />6. Temporary Cessation ..............................842.11(e) & 816/817.131 <br />7. AML Rec. Fees -- Non-Respondant ................................ 870. 15(b) <br />8. AML Rec. Fees -- Failure to Pay .....................................870.15(a) <br />B. Hydrologic Balance ......................................(816/817.41-57) <br />1. Drainage Control .............................................................. ...........45 <br />2. Inspections & Certifications ............................................ .49(a)(10) <br />3. Siltation Structures .......................................................... ............46 <br />4. Discharge Structures ....................................................... ............47 <br />5. Diversions ........................................................................ ...........43 <br />6. Effluent Limits ................................................................. ...........42 <br />7. Ground Water Monitoring ............................................... .......41(c) <br />8. Surface Water Monitoring ............................................... .......41(e) <br />9. Drainage--Acid - Toxic Materials .................................... .......41(f) <br />10. Impoundments ................................................................. ...........49 <br />11. Stream Buffer Zones ........................................................ ...........57 <br />C. Topsoil & Subsoil ...............................................(816/817.22) <br />1. Removal ..................................................................................22(a) <br />2. Substitute Materials .................................................................22(c) <br />3. Storage and Protection .............................................................22(c) <br />4. Redistribution ..........................................................................22(d) <br />M 1 I)Phase 2 Bond Release <br />- -2) <br />- -3) <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placement ............................................................... ............................71(e) <br />2. Drainage Control ................................................... .............................71(f) <br />3. Surface Stabilization .............................................. .............................71(g) <br />4. Inspections & Certifications ................................... ............................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,(816/817.81-84) <br />1. Drainage Control ................................................... ............................83(a) <br />2. Surface Stabilization ............................................... ...........................83(b) <br />3. Placement .........................................................................................:.83(c) <br />4. Inspections and Certifications ................................. ..........................83(d) <br />5. Impounding Structures ............................................ ...............................84 <br />G. Use of Explosives ..................................................(816/817.61-68) <br />1. Blaster Certification ...........................................................................61(c) <br />2. Distance Prohibitions .........................................................................61(d) <br />3. Blast Survey/Schedule .......................................................................62-64 <br />4. Warnings & Records ......................................................................66 & 68 <br />5. Control of Adverse Effects .....................................................................67 <br />H. Subsidence Control Plan .........................................(817.121-122) <br />1. Roads .................................................................(816/817.150-151) <br />1. Road Construction ...........................................................................150(c) <br />2. Certification ......................................................................................151(a) <br />3. Drainage ...............................................................................150(b)-151(d) <br />4. Surfacing and Maintenance ..................................................150(e)-151(d) <br />5. Reclamation ......................................................................................150(f) <br />J. Signs & Markers .......................................................(816/817.11)1 <br />1. <br />2. <br />D. Backfilling & Grading ..............................(816/817.95-107) K <br />1. Exposed Openings .....................816/817.13, 14, 15, & 823.11 & 21 L <br />2. Contemporaneous Reclamation ..................................................100 <br />3. Approximate Original Contour ..........................................102(a)(1) 1 <br />4. Highwall Elimination .........................................................102(a)(2) 2. <br />5. Steep Slopes (includes downslope) ............................................107 M. <br />6. Handling of Acid & Toxic Materials ......................................102(c) <br />7. Stabilization (rills and gullies) ..................................................95(b) <br />Signs ..................................................................................... I l (a),(b),&(c) <br />Markers ...................................................................... I l (a),(b),(d),(e),&(f) <br />Distance Prohibitions .......................................................(761.11) <br />Revegetation .....................................................(816/817.111-116) <br />Vegetative Cover .......................................................................1.11 & 116 <br />Timing ..................................................................................................113 <br />Postmining Land Use ..............................................(816/817.133) <br />Revised December 4, 1998 Page 2 of <br />H. 3 Subsidence Control Plan <br />1. Roads <br />1. Road Construction <br />2. Certification <br />3. 1 Drainage <br />4. Surfacing and Maintenance <br />5. 1 Reclamation <br />J. Signs & Markers <br />1._ Signs <br />2. Markers <br />K. -Distance Prohibitions <br />L. Revegetation <br />1._ Vegetative Cover <br />2. Timing <br />M. 1 Postmining Land Use <br />N. Other <br />General <br />Performance <br />Catagory
The URL can be used to link to this page
Your browser does not support the video tag.