Laserfiche WebLink
Pagel of 2 <br />BULLDOZER WORK <br />Task description: <br />Site: Frentress Gravel Pit <br />Placement of <br />Permit Action: Initial Bond <br />PROJECT IDENTIFICATIQ?\ <br />Task #: 005 <br />Date: 3/31/2011 <br />User: DMC <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EQU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />[PMENT COST <br />Cat D8R Series II - 8U (2005) <br />310 <br />Universal <br />NA <br />1 per day <br />(CRG) <br /> Utilization % <br />Ownership Cost/Hour: $39.08 NA <br />Operating Cost/Hour: $81.13 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $158.69 <br />Total Fleet Cost/Hour: $158.69 <br />MATERIAL Q UANTITIES <br />Initial Volume: 12,000 <br />Swell factor: 1.000 <br />Loose volume: 12,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />1.627.0 LCY/hr <br />Materials consistency description: Loose <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,380 feet <br />1,6001bs/LCY <br />Weight description: Top Soil <br />1.2 <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Permit/Job#: M2011017 <br />Abbreviation: None <br />Filename: MO 17-005 <br />CIRCES Cost Estimating Software