Laserfiche WebLink
L -1 <br />Soil and Vegetation Inventory & Revegetation Report <br />L -2 <br />Soils Map <br />L -3 <br />Vegetation Map (archived) <br />L -4 <br />Revegetation Research Report <br />L -5 <br />Vegetation Map with Sampling Locations <br />M -1 Existing Surface Features Map <br />N -1 through <br />N -3 <br />Site Plan Drawings <br />N -4 <br />Site Development Drawing <br />N -5 <br />Topsoil Piles - Location Map (archived) <br />N -6 through <br />New Addition - Elevation <br />N -9 <br />Paved Access Road Drawings <br />N -10 <br />Access Road - Profile and Typical Cross - Section <br />N -10a <br />Light Duty Road - Typical Cross - Section <br />0-1 <br />Office and Shop Plans <br />0-2 <br />Office and Shop Elevations <br />O -A1 <br />New Addition - Site Plan <br />O -A2 <br />New Addition - Elevation <br />P -1 and <br />MR #28 - Coal Supply Testing <br />P -2 <br />Electrical Distribution Line Drawings <br />P -3 <br />"Letter of Understanding" (05/28/93) <br />Q -1 <br />Reclamation Contour and Drainage Plan Map (Final) <br />Q -1 a <br />Topographic Map - Original Drainage <br />Q -3 <br />Pre Mining Contours <br />R -1 <br />TR #31 - Coal Supply Change <br />R -2 <br />MR #28 - Coal Supply Testing <br />R -3 <br />MR #32 - Coal Testing & Temporary Coal Supply <br />R -4 <br />MR #34 - Mine Waste Rock Addition <br />R -5 <br />MR #38 — Additions to the Reclamation Plan <br />R -6 <br />TR #34 — Final Contour Modification Across Long Term Spoil <br />R -7 <br />TR #35 — Change of Coal Supply /Source of Ash <br />R -8 <br />TR #36 — Change Approved Post - Mining Land Use — Partial (1) <br />R -9 <br />TR #38 — Change Approved Post - Mining Land Use — Partial (2) <br />R -10 <br />TR #39 — Change Approved Post - Mining Land Use — Partial (3) <br />R -11 <br />MR #39 — Administrative Updates <br />R -12 <br />MR #40 — Variance from Contemporaneous Reclamation <br />R -13 <br />MR #41 — Mid -Term Review <br />11/10 <br />