Laserfiche WebLink
01-27-'09 12;18 FROM- <br />Return by January 27, 2008 at 3:30 P.M. to, <br />T-023 P0002/0005 F-077 <br />Receipt of Addenda Nos. <br />is hereby acknowledged <br />Yvonne Brannon <br />Uivisiori of Reclamation, Mining and Safety <br />1313 ShermOn .St.; #215. <br />Denver, CO $020$ <br />Fax (S0s) 8$2-8405 <br />FRUITA MIND MAINTENANCE <br />BOND REVOCATION PRQJ. C `; M-1081-016 <br />PKA-0.114J' <br />1310SCt't90OLPE <br />Item Daaeri . tine" ! TY, Unit . Unit Pri. a At1llOunt <br />1. Mobilization/Demobilization 1 Job N/A <br />2. Sediment Pond Maintenance 1 Joq N/A $ . ( ?1 <br />3. Rock Check Dom Constrodon <br />3a. Road/Fill 'Outslops Check Kama 15: Each O..Ieach <br />3b. Portal Bench Check Dame 5 Each $ each $ <br /> Drainage Channel Ropair.and <br />Construction <br />250 <br />Ln.Pt <br /> <br />ZD. 1L:F <br />$ .. <br /> <br />$ qii <br />5. Portal R0 air and Rock A . ron 1 Job N/A.. $? <br />6. Revegetatlan.. fertilizing, seeding, <br />mtalah:in and crim ,.fin afire <br />1 <br />Acre <br />$ /acre <br />Additional Items (if required) <br /> <br /> <br />7. Equipment Rental- Excavator, CAT <br />3208L, or equivalent sized w/ <br />minimum 20' reach, turbo Charged <br />and operator <br /> <br />10 <br /> <br />Mourn <br />? <br />$ Q /hr. <br /> <br />$„ <br /> <br />8. Provide and install additional rip-rap <br />per s eas if required at the and <br />10: <br />CY <br />NIA <br />$ a ono 0 <br />THIS BID SCHEDULE MUST W! RETURNED <br />Rage 1 of2 Pages