Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 111 State : Colorado Permit/job# : C-1981-038 <br />Date : 1210212010 County: Delta Abbreviation : none <br />User : JRS Site: Bowie No. 1 Mine Filename :C038-111 <br /> <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review (MT-6) <br />Task description :Replace Topsoil from Stockpile to Light-Use Roads to Drill Pads <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $89.77 NA <br /> Operating cost/hour : $128.30 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $256.60 Total fleet cost/hour : $1,026.41 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,635 BCY factor : 1.250 volume : 8,294 LCY <br /> <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 946.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,850 feet Material weight : 1.10 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,100 Ibs/LCY Net correction : 0.49 <br />Weight description : <br />Earth - Loam Adjusted unit production : 466.04 LCY/hr <br /> Adjusted fleet production : 1,864.17 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 4.45 Hours <br />Unit cost : $0.551 /LCY Total job cost : $4,567