Laserfiche WebLink
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 105 State : Colorado Permit/job #: C-1981-038 <br />Date : 1210212010 County :Delta Abbreviation :none <br />User : JRS Site : Bowie No. 1 Mine Filename : C038-105 <br />Permit or other job action :2010 Midterm Review (MT-6) <br />Task description: Haut Stevens Gulch Topsoil to OVM <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />?Eauioment Description <br />Truck/loader team -Truck : Cat 773D (2002) <br />-Loader : CAT 990 Series 11(2005) <br />Support equipment -Load area : Cat D10R - 10SU (2005) <br />-Dump area : Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker. 5.000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />% Utilization-machine : 100 76 100 100 50 50 <br />-Ripper attachment : NA NA 0 0 0 _ <br />NA <br />Ownership cost/hour : $63.47 $106.04 $76.61 $76.61 $41.68 $24.58 <br />Operating cost/hour : $87.44 $79.42 $128.30 $128.30 $23.13 $16.65 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 NA <br /> <br />Operator cost/hour : <br />$22.29 <br />$38.72 <br />$38.54 <br />$38.54 <br />$24.50 _ <br />$38.70 <br />Unit subtotals : $173.20 $224.18 $243.45 $243.45 $89.31 $79.93 <br />Number of units : 5 1 1 1 1 1 <br />Group subtotals : Work : $1,090.18 Support : $486.89 Maintenance : $169.24 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 3.388 CCY <br />Total work team cost/hour : $1,746.31 <br />Swell Loose <br />factor : 1.115 volume : 3,778 LCY <br />65 <br />Source of quantity take-off :Permit Volume 1, Page <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : <br />Material weight : 2,100 pounds/LCY Struck volume : 33.80 <br />Descr.:Earth -Loam Heaped volume : 45.90 <br />Rated payload : 108,060 pounds Average volume : 39.85 <br />Payload capacity : 51.46 LCY Adjusted volume": 45.90 <br /> Final truck volume based on number of loader passes : 41.62 <br /> 'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) <br />Rated capacity (nom. heaped) : 11.250 LCY Truck Loader <br />Descr.: Loose material - 118" to 318" (90 - 95%) Altitude adj.: 1.000 1.000 <br />Bucket fill factor : 0.925 Job efficiency : 0.830 0.830 <br />Adjusted bucket capacity: 10.406 LCY Net correction : 0.830 0.830 <br /> <br />Total cost : $0 <br />Truck Bed (volume) Basis : <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />7,100 <br />Source