My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-24_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2011-01-24_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:19 PM
Creation date
4/1/2011 9:05:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
1/24/2011
Doc Name
Cost Summary
Section_Exhibit Name
Reclamation Cost Estimate MR126
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 101 State : Colorado Permit/job# : C-1981-038 <br />Date : 1210212010 County:Delta Abbreviation :none <br />User : JRS Site: Bowie No. 1 Mine Filename :C038-101 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review (MT-6) <br />Task description :Move Fill Topsoil Pile into Stockpiled Area <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis :-I per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $89.77 NA <br />Operating cost/hour : $128.30 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $256.60 Total fleet cost/hour : $1,026.41 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 20,700 CCY factor : 1.115 volume : 23,080 <br />Source of estimated volume: Map - OVWM Topsoil Replacement <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors <br /> Operator skill : 0.75 <br />Average push distance : 250 feet Material consistency : 1.00 <br />Unadjusted hourly production : 754.3 LCY/hr Dozing method : 1.00 <br /> Visibility: 1.00 <br />Material consistency description : Job efficiency : 0.83 <br />Consolidated stockpile Spoil pile : 0.80 <br /> Push gradient : 0.54 <br />Average push gradient : 20.00 % (pos) Altitude : 1.00 <br />Average site altitude : 7,200 feet Material weight : 1.10 <br /> Blade type : 1.00 <br />Material weight : 2,100 Ibs/LCY Net correction : 0.30 <br />Weight description <br />Earth - Loam Adjusted unit production : 224.06 <br /> Adjusted fleet production : 896.22 <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Unit cost : $1.145 /LCY <br />LCY <br />Source <br />(avg.) <br />Cat HB <br />(gen.) <br />(1 shift/daj <br />(fnd-ri) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />/SARI 1/11) <br />LCY/hr <br />LCY/hr <br />Total job time : 25.75 Hours <br />Total job cost : $26,433
The URL can be used to link to this page
Your browser does not support the video tag.