My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-24_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2011-01-24_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:19 PM
Creation date
4/1/2011 9:05:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
1/24/2011
Doc Name
Cost Summary
Section_Exhibit Name
Reclamation Cost Estimate MR126
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : 055 <br />Date : 12/02/2010 <br />User : JRS <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review (MT-6) <br />Task description :Rip Outer 22 Feet of Asphalt Haul Road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Utilization % <br />$86.56 NA <br />$126.50 100 <br />$8.09 100 <br />$38.54 NA <br />$259.69 Total fleet cost/hour : $1,038.77 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume <br />Area : 1.77 acres Rip depth (ft) : 0.50 Volume <br />Source of estimated quantity: Map 5C-6A and 8A-2 <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity: NA feet/second <br />Unadjusted production : NA cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.88 feet/pass <br />Average ripping width : 8.67 feet/pass <br />Average ripping length : 200.00 feet/pass <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.947 acres/hour <br />Unadjusted production : 4,399.05 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) <br />Unit cost : $0.071 per cu. yd. <br />State : Colorado <br />County :Delta <br />Site: Bowie No. 1 Mine <br />NA <br />1,428 <br />BCY <br />BCY or CCY <br />1 lly11U1uu1I VVI I GI.LRAI rQULUTA <br />Unadjusted production <br />per selected method : 4,399.05 cu. yds./hour <br />Site altitude : 7,100 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production : 3,651.21 cu. yds./hour <br />Adjusted fleet production : 14,604.84 cu. yds./hour <br />Total job time : 0.10 hours <br />Total job cost : $102 <br />Permit/job # :C-1981-038 <br />Abbreviation :none <br />Filename : C038-055
The URL can be used to link to this page
Your browser does not support the video tag.