My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-24_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2011-01-24_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:19 PM
Creation date
4/1/2011 9:05:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
1/24/2011
Doc Name
Cost Summary
Section_Exhibit Name
Reclamation Cost Estimate MR126
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task #: 050 State : Colorado Permit/job #:C-1981-038 <br />Date : 1210212010 County : Delta Abbreviation :none <br />User : JRS Site: Bowie No. 1 Mine Filename :C038-050 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review (MT-6) <br />Task description :Regrade Timber Storage Access Road <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 330C L <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1.866 <br />Swell Loose <br />BCY factor : 1.330 volume <br />Source of estimated volume: Map 8-2 <br />Source of estimated swell factor:-CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket. swing loaded. dump bucket. swina empty) <br />Basic job condition description <br />AVERAGE <br /> Secondary job condition within basic description : AVERAGE <br /> Cycle time value : 0.32 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2.25 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 9091o) <br />Adjusted bucket capacity: 1.91 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,000 feet Altitude adjustment : 1.00 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production : 357.48 LCY/hour <br />Adjusted hourly unit production : 296.71 LCY/hour <br />Adjusted hourly fleet production : 296.71 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 8.36 hours <br />Unit cost : $0.464 per LCY Total job cost : $1,153 <br />Utilization % <br />Ownership cost/hour : $45.38 NA <br />Operating cost/hour : $53.71 100 <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $137.82 <br />Horsepower: 244 <br />Weight (MT) : 33.72 <br /> <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $137.82 <br />2,482 LCY
The URL can be used to link to this page
Your browser does not support the video tag.