Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 001 <br />Date : 1210212010 <br />User : JRS <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Delta <br />Site: Bowie No. 1 Mine <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review (MT-6) <br />Task description :Push Fill from Zone 1-A to Zone 4-A at CBS Bench <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 48,923 <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Ownership cost/hour : $89.77 NA <br />Operating cost/hour : $128.30 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $256.60 Total fleet cost/hour : $1,026.41 <br />CCY <br />Swell Loose <br />factor : 1.165 volume <br />Source of estimated volume: Map 5C-6A and 8A-2 <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 275 feet <br />Unadjusted hourly production : 680.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient:- 30.00 % (I <br />Average site altitude : 6,900 feet <br />Material weight : 2900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Unit cost : $3.563 /LCY <br />56,995 LCY <br />Job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1da) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : a30 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.11 <br />Adjusted unit production : 72.03 LCY/hr <br />Adjusted fleet production : 288.10 LCY/hr <br />Total job time : 197.83 Hours <br />Total job cost : $203,056 <br /> <br />Permit/job# : C-1981-038 <br />Abbreviation :none <br />Filename : C038-001