My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-24_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2011-01-24_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:19 PM
Creation date
4/1/2011 9:05:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
1/24/2011
Doc Name
Cost Summary
Section_Exhibit Name
Reclamation Cost Estimate MR126
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety <br />Task # : 010 State : Colorado Permit/job #: C-1981-038 <br />Date : 1210212010 County : Delta Abbreviation : none <br />User : JRS Site :Bowie No. 1 Mine Filename :C038-010 <br />Permit or other job action :2010 Midterm Review (MT-6) <br />Task description: Haul Fill from Storage Zone 1-B to Portal Zone 4-C <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />lEauir)ment Description <br />Truck/loader team -Truck : Ct 773D (2002) <br />-Loader : T 9 90 Series 11(2005) <br />-Water truck : Water Tanker, 5,000 Gal. <br />sheet 1 of 2 <br />Support equipment -Load area : Cat D10R - 10SU (2005) <br />-Dump area : Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader : CAT 14H <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />% Utilization-machine : 100 98 100 100 50 50 <br />-Ripper attachment : NA NA 0 0 0 NA <br />Ownership cost/hour : $63.47 $106.04 $76.61 $76.61 $41.68 $24.58 <br /> <br />Operating cost/hour : <br />$87.44 <br />$103.18 <br />$128.30 <br />$128.30 <br />$23.13 _ <br />$16.65 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 NA <br />Operator cost/hour : $22.29 $38.72 $38.54 $38.54 $24.50 $38.70 <br />Unit subtotals : $173.20 $247.94 $243.45 $243.45 $89.31 $79.93 <br /> <br />Number of units : <br />5 <br />1 <br />1 <br />1 <br />1 _ <br />1 <br />Group subtotals : Work : $1,113.93 Support : $486.89 Maintenance : $169.24 <br />Total work team cost/hour : $1.770.06 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 6,298 CCY factor : 1.165 <br />Source of quantity take-off :Map 5C-6A and 8A-2 <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed <br />Loose <br />volume: <br />Total cost <br />me) Basis : <br />$0 <br />Material weight : 2900 pounds/LCY Struck volume : 33.80 LCY <br />Descr.: Decomposed rock - 50% Rock, 50% Earth Heaped volume : 45.90 LCY <br />Rated payload : 108,060 pounds Average volume : 39.85 LCY <br />Payload capacity: 37.26 LCY Adjusted volume`: 37.26 LCY <br /> Final truck volume based on number of loader passes : 37.13 LCY <br /> `truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 7,100 <br />Rated capacity (nom. heaped) : 11.250 LCY Truck Loader Source <br />Descr.:Other - rock/dirt mixtures (100-120%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 12.375 LCY Net correction : 0.830 0.830 <br /> <br />7,337 LCY
The URL can be used to link to this page
Your browser does not support the video tag.