Laserfiche WebLink
ROADABLE EQUIPMENT <br />sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Generic 8-10 cy, 6x4 $63.61 6 $381.68 $381.68 <br />-Flatbed Truck, 6x4, 45K GVW $90.64 1 $90.64 $90.64 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $472.32 $472.32 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 1.00 1.00 Total non-roadable mob/demob cost <br />Return time (hours) = 1.00 1.00 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** <br />Unloading time (hours) = a50 NA *• one round trip, no haul rig <br />Subtotals = 3.00 2.00 <br />JOB TIME AND COST Total job time <br />Total job cost <br />Delta <br />45.0 miles <br />45.0 mph <br />$1, 980.27 <br />$944.64 <br />6.00 hours <br />$Z925 <br />