Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety <br />Task # : 008 State : Colorado Permit/job #: C-1981-038 <br />Date : 1210212010 County :Delta Abbreviation :none <br />User : JRS Site : Bowie No. 1 Mine Filename : C038-008 <br />Permit or other job action :2010 Midterm Review (MT-6) <br />Task description: Haul Fill from C&S Zone 1-A to Portal Zone 4-C <br />HOURLY EQUIPMENT COST Shiftbasis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck : Cat 773D (2002) <br />-Loader : CAT 990 Series 11 (2005) <br />Support equipment -Load area : Cat D10R - 10SU (2005) <br />-Dump area :,Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck :Water Tanker, 5,000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />% Utilization-machine : 97 100 100 100 50 50 <br />-Ripper attachment : NA NA 0 0 0 NA <br />Ownership cost/hour : $63.47 $106.04 $76.61 $76.61 $41.68 $24.58 <br />Operating cost/hour : $85.14 $104.94 $128.30 $128.30 $23.13 $16.65 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 NA <br />Operator cost/hour : $22.29 $38.72 $38.54 $38.54 $24.50 $38.70 <br />Unit subtotals : $170.90 $249.70 $243.45 $243.45 $89.31 $79.93 <br />Number of units : 5 1 1 1 1 1 <br />Group subtotals : Work : $1,104.18 Support : $486.89 Maintenance : $169.24 <br />MATERIAL QUANTITIES <br />Total work team cost/hour : $1,760.31 <br />Initial Swell <br />volume : 100,560 CCY factor : 1.165 <br />Source of quantity take-off : Map 5C-6A and 8A-2 <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Caoacitv : <br />Loose <br />volume <br />Total cost <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2900 pounds/LCY Struck volume : 33.80 LCY <br />Descr. : Decomposed rock - 50% Rock, 50% Earth Heaped volume : 45.90 LCY <br />Rated payload : 108,060 pounds Average volume : 39.85 LCY <br />Payload capacity : 37.26 LCY Adjusted volume': 37.26 LCY <br /> Final truck volume based on number of loader passes : 37.13 LCY <br /> ' truck volume adjusted to not exce ed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 7,100 <br />Rated capacity (nom. heaped) : 11.250 LCY Truck Loader Source <br />Descr.:Other - rock1birt mixtures (100-120%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity: 12.375 LCY Net correction : 0.830 0.830 <br />117,152 LCY <br />$0