Laserfiche WebLink
§2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING ACTIVITIES - <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />Backfillin and Grading <br />9 <br />1. The two mine adits have been backfilled in accordance with Volume <br />6A -Final Abandonment Tab, Figure 2.05-6. <br />2. As the result of a mine fire in 1986, the ventilation shaft was sealed. <br />3. Although the mine permit describes "rock tunnels", they were never <br />constructed and therefore references to these structures and their <br />subsequent reclamation elsewhere in the permit should be ignored. <br />Timber Storage Area <br />The ROM storage pile has been reduced from approximately 38,000 <br />cubic yards of stored ROM coal to approximately 17,000 cubic yards of <br />ROM coal storage. <br />Unit Train Loadout and Highway Stockpile <br />The Highway Stockpile was temporarily stabilized during 2002. <br />Reclamation work was performed from September 2006 through <br />November 2006 at the unit train loadout. The truck dump, silos, loadout <br />and associated structures and conveyors were dismantled and removed <br />from the site. Concrete foundations were removed to at least the level <br />of existing grade. Concrete from the silos and other structures was <br />crushed and stockpiled on site. <br />/rya-12i <br />Permit Renewal ~S) 60-c <br />11/14/07 <br />/1 PP1zo~ eD <br />~/y/o ~ <br />