Laserfiche WebLink
2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING ACTIVITIES - <br />MZNIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />Table 2.05-9 shows runoff expectations at East Mine. <br />TABLE 2.05-4 <br />I• <br />Permit Renewal <br />RN -44 C4/9/09~ <br />n)R--) OG <br />UPSTREAM AREA AND 10-YEAR, 29-HOUR INFLOW <br /> OF EAST MINE SEDIMENT RETENTION PONDS <br /> APPROXIMATE UPSTREAM ESTIMATED <br /> AREA (ACRES) 10-YEAR <br /> 29-HOUR <br /> DISTURBED 0.04 UNDISTURBED INFLOW <br />POND # ACRE FEET/ACRE 0.01 ACRE (ACRE FEET) <br /> FEET/ACRE <br />1 - 18.7 0.19 <br /> 9.3 - 0.37 <br />2 - 9.3 0.09 <br /> 6.6 - 0.26 <br />3,4, - ~ 22.1 0.22 <br />WASTE AREA POND 22.8 - 1.04 <br />TOTAL 38.7 45.1 2.12 <br />The total required and actual sedimentation pond storage volumes <br />are: <br />SEDIMENT <br />POND # VOLUME 10-YEAR, <br />24 HOUR TOTAL <br />REQUIRED ACTUAL <br />VOLUME <br />1 0.14 0.56 0.70 0.70 <br />2 0.10 0.30 0.40 0.51 <br />3,9 6 WASTE <br />AREA POND 0.34 1.26 1.60 1.79 <br />Sedimentation Pond Nos. 1 through 9 are equipped with conduit <br />spillways which will allow de-watering as provided for in <br />4.05.5. The waste area pond was constructed with a non-clogging, <br />conduit-type de-watering device and spillway, as specified in <br />4.05.6(3). Water, after proper detention time, may be used for <br />dust control or re-vegetation efforts. The dams will be checked <br />after heavy rainfall or snow-melt for stability, safety, and <br />capacity by a qualified inspector. <br />Sediment volume will be monitored and ponds will be cleaned <br />according to the Sediment Monitoring Program. <br />The Sediment Monitoring Program is designed to comply with <br />4.05.6. See Ponds, Impoundments, and Dams Appendix in Volume BA. <br />- 20 - <br />01/03 <br />