Laserfiche WebLink
2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING ACTIVITIES - <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />TABLE 2.05-3 <br />SEDIMENT STORAGE REQUIREMENTS OF <br />EAST MINE <br /> * ** +*+ <br /> 0.1 0.015 0.035 <br />POND # APPROXIMATE UPSTREAM <br /> AREA ACRES ACRE-FT ACRE-FT ACRE-FT <br /> DISTURBED UNDISTURBED PER ACRE PER ACRE PER ACRE <br />1 9.3 18.7 0.93 0.19 0.33 <br />2 6.6 4.3 0.66 0.10 0.23 <br />3,9 22.6 22.1 2.28 0.34 O.BO ' <br />WASTE AREA <br />POND <br />TOTAL 38.7 45.1 3.87 0.58 1.36 <br /> * Normal requirement <br /> ** Calculation of sediment expected to be transported to <br />• sediment storage area. As per ca lculation by Leaf using <br /> Universal Soil Loss Equation (See Soils Appendix in Volume <br /> 9 for additional information.) <br /> *** Absolute minimum <br />For calculations on drainage areas see Map No. 8-9 and Ponds, <br />Impoundments and Dam Appendix in Volume B. <br />The Ponds will be maintained and cleaned after sediment volume <br />reaches levels as specified in the sediment monitoring program. <br />In 1982, a small sewage water holding pond located beneath the <br />sewage treatment plant was constructed to intercept and hold <br />effluent from the sewage treatment plant. In January 1991, the <br />Division approved a soil storage site on the location formerly <br />occupied by this pond as construction of the West Ridge Waste <br />Pile moved up-slope into the area of the pond. This topsoil has <br />now been spread on the waste pile and the former stockpile <br />reclaimed. <br />J <br />Permit Renewal - 18 - 01/03 <br />R/Y U y ~4~9/a y) <br />/'1.2-ld6 <br />