My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-04_PERMIT FILE - C1996083A (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2011-01-04_PERMIT FILE - C1996083A (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:37 PM
Creation date
4/1/2011 8:09:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/4/2011
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />(3)(a) Following is a discussion of the proposed mine facilities: <br />Portal Conveyor Transfer Buildings <br />The D -Seam portal conveyor transfer building is a structural steel building <br />where the main belt from the mine terminates. The coal from the mine will <br />transfer to the stockpile conveyor. Gob conveyed from the mine will be <br />transferred to the gob belt. The dimensions of the building are approximately <br />20 feet by 24 feet by 45 feet high. The B -Seam will have a similar transfer <br />building. Gob conveyed from the B -Seam will be transferred via a steel chute <br />to a concrete gob bin. Coal conveyed from the B -Seam is transferred to the <br />uphill conveyor. <br />Stacking Tube <br />The raw coal is stacked by this concrete tube to minimize coal segregation <br />and air particulate emissions. The tube is approximately 85 -feet high and 12- <br />feet in diameter. It has 4 foot openings to allow coal to flow from the tube to <br />the stockpile area. The stacking tube is located directly on the reclaim <br />tunnel. <br />• Reclaim Tunnel <br />The reclaim tunnel is located under the stacking tube and a 70,000 ton <br />stockpile. It is of reinforced concrete construction. The typical inside <br />dimensions of the tunnel are 13 feet high by 12 feet wide. The tunnel is <br />approximately 245 feet long. A 36 -inch diameter escape tube is located on <br />the east end of the tunnel. The 120 foot long escape tube terminates at a <br />concrete fan housing that is approximately 6 feet by 6 feet by 8 feet high. <br />Screen and Crusher Buildinq <br />The screen and crusher building is a structural steel building that is <br />approximately 52 feet high. The building houses a double deck screen and <br />crusher. It has the capability of producing 2 "x0" crushed coal and stoker <br />sized coal. The dimensions of the building are approximately 40 feet by 21 <br />feet by 52 feet high. <br />MCC Buildinq <br />There are two motor control center buildings. One located on the D -Seam <br />portal bench northeast of the screen and crusher building is a cinder block <br />building. It is approximately 18 feet by 42 feet with an 11 foot eave height. It <br />has_a_concrete roof. One is located-on the. Hubbard Creek shaft pad. It is <br />approximately 15 feet by 25 feet with a 12 foot eave height. <br />PR -12 2.05-13- 02/10 <br />h PPP16"D <br />1 a <br />
The URL can be used to link to this page
Your browser does not support the video tag.